United States β€Ί Grid β€Ί Interconnection queues β€Ί California

OCTARY USA Β· INTERCONNECTION QUEUES

Other interconnection queue in California

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown105,523 MW
Active in queue5,523 MW10 requests
Agreement signed1,902 MW3 requests
Withdrawn4720.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

10 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Other project Q572, Riverside County
Other
1,300 MWIn study Riverside, CAWest May 2024target 2031
Potentia-Viridi
Other
1,225 MWAgreement signed San Joaquin, CACAISO Apr 2020target 2028
Matterhorn
Other
1,218 MWIn study Riverside, CACAISO Apr 2023target 2029
Willow Rock Energy Storage
Other
620 MWAgreement signed Kern, CACAISO Apr 2020target 2030
Other project SC1Q31, Sacramento County
Other
400 MWIn study Sacramento, CAWest Jul 2025target 2032
Other project Q91, Los Angeles County
Other
346 MWIn study Los Angeles, CAWest Jun 2022target 2030
Other project SC1Q33, Sacramento County
Other
250 MWIn study Sacramento, CAWest Jul 2025target 2030
Other project GI-2020-139, Riverside County
Other
80.0 MWIn study Riverside, CAWest Nov 2020target 2027
Bottle Rock Power
Other
56.9 MWAgreement signed Lake, CACAISO Sep 20052007
Other project GI-2021-144, Imperial County
Other
28.0 MWIn study Imperial, CAWest Mar 2021target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)