United States › Grid › Interconnection queues › California

OTHER · WEST

Other project GI-2020-139, Riverside County

Other project GI-2020-139, Riverside County is a 80.0 MW other request in interconnection study in the West interconnection queue, in Riverside County, California, connecting to Imperial Irrigation District.

Queue statusIn planning
  1. PlanningQueued Nov 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-2020-139
Grid region
West (non-ISO utilities)
Utility / transmission owner
Imperial Irrigation District
Connection point (POI)
92kV Coachella Valley Substation
Location
Riverside County, California
Technology
Other: 80.0 MW
Total requested
80.0 MW
Study phase
In Progress (unknown study)
Queue status
Active
Entered queue
9 November 2020
Proposed online date
June 2027

Location

Marker shows the centre of Riverside County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Riverside County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem