United States β€Ί Grid β€Ί Interconnection queues β€Ί Alabama

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Alabama (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5731 MW
Active in queue731 MW5 requests
Agreement signed571 MW3 requests
Withdrawn387,006 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 385, Lawrence County
Solar
200 MWAgreement signed Lawrence, ALSoutheast Aug 2019target 2026
Solar project 405, Lawrence County
Solar
193 MWAgreement signed Lawrence, ALSoutheast Nov 2019target 2027
Solar project 387, Colbert County
Solar
178 MWAgreement signed Colbert, ALSoutheast Aug 2019target 2027
Solar project IC-832, Monroe County
Solar
80.0 MWPaused / redesign Monroe, ALSoutheast Oct 2019target 2026
Solar project IC-831, Washington County
Solar
80.0 MWPaused / redesign Washington, ALSoutheast Oct 2019target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)