United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in SPP (Southwest Power Pool) (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown102,198 MW
Active in queue8,165 MW35 requests
Agreement signed5,968 MW25 requests
Withdrawn6010.4 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

10 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project GEN-2020-087, Comanche County
Solar
500 MWIn study Comanche, OKSPP Apr 2020target 2026
Onshore wind project GEN-2020-067, Terry County
Onshore wind
353 MWIn study Terry, TXSPP Apr 2020target 2026
Solar + storage project GEN-2020-011, Phelps County
Solar + storage
320 MWIn study Phelps, NESPP Apr 2020target 2028
Solar + storage project GEN-2020-013, Harlan County
Solar + storage
215 MWIn study Harlan, NESPP Apr 2020target 2027
Battery storage project GEN-2020-090, Bourbon County
Battery storage
204 MWIn study Bourbon, KSSPP Apr 2020target 2026
Battery storage project GEN-2020-060, Lubbock County
Battery storage
200 MWIn study Lubbock, TXSPP Apr 2020target 2027
Solar + storage project GEN-2020-010, Woodward County
Solar + storage
140 MWIn study Woodward, OKSPP Apr 2020target 2027
Solar + storage project GEN-2020-012, Jackson County
Solar + storage
113 MWIn study Jackson, OKSPP Apr 2020target 2027
Solar project GEN-2020-092, Mayes County
Solar
100 MWIn study Mayes, OKSPP Apr 2020target 2026
Onshore wind project GEN-2020-069, Cherry County
Onshore wind
52.9 MWIn study Cherry, NESPP Apr 20202025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)