United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESQueue requests in study in SPP (Southwest Power Pool) (2020 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project GEN-2020-087, Comanche County Solar |
500 MW | In study |
| Onshore wind project GEN-2020-067, Terry County Onshore wind |
353 MW | In study |
| Solar + storage project GEN-2020-011, Phelps County Solar + storage |
320 MW | In study |
| Solar + storage project GEN-2020-013, Harlan County Solar + storage |
215 MW | In study |
| Battery storage project GEN-2020-090, Bourbon County Battery storage |
204 MW | In study |
| Battery storage project GEN-2020-060, Lubbock County Battery storage |
200 MW | In study |
| Solar + storage project GEN-2020-010, Woodward County Solar + storage |
140 MW | In study |
| Solar + storage project GEN-2020-012, Jackson County Solar + storage |
113 MW | In study |
| Solar project GEN-2020-092, Mayes County Solar |
100 MW | In study |
| Onshore wind project GEN-2020-069, Cherry County Onshore wind |
52.9 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)67 Β· 19.0 GW
- ERCOT (Texas)57 Β· 12.2 GW
- MISO (Midcontinent)56 Β· 9,500 MW
- PJM (Mid-Atlantic, Midwest)50 Β· 5,495 MW
- CAISO (California)9 Β· 3,749 MW
- Southeast (non-ISO utilities)29 Β· 2,767 MW
- NYISO (New York)19 Β· 2,230 MW
- SPP (Southwest Power Pool)10 Β· 2,198 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)