United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in South Dakota, SPP
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Onshore wind project GEN-2017-014, Haakon County Onshore wind |
300 MW | Agreement signed |
| Solar + storage project GEN-2024-035, Brown County Solar + storage |
270 MW | In study |
| Onshore wind project GEN-2017-175, Turner County Onshore wind |
270 MW | Agreement signed |
| Onshore wind project GEN-2024-285, Clark County Onshore wind |
250 MW | In study |
| Solar project GEN-2024-283, Meade County Solar |
150 MW | In study |
| Solar project GEN-2024-282, Meade County Solar |
150 MW | In study |
| Gas project ERAS-2025-035, Brown County Gas |
138 MW | In study |
| Onshore wind project GEN-2016-087, Campbell County Onshore wind |
98.9 MW | Agreement signed |
| Onshore wind project GEN-2025-GR4, Aurora County Onshore wind |
10.8 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)18 Β· 4,841 MW
- West (non-ISO utilities)21 Β· 3,150 MW
- SPP (Southwest Power Pool)9 Β· 1,638 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)