United States βΊ Grid βΊ Interconnection queues βΊ Michigan
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Michigan, PJM
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Three Lakes Solar Solar + storage Β· Three Lakes Solar LLC |
300 MW | In study |
| Cass County Solar Solar + storage Β· Steelhead Solar, LLC |
200 MW | In study |
| Solar project AH1-272, Van Buren County Solar Β· Bankson Solar Project, LLC |
185 MW | In study |
| Solar + storage project AH2-373, Berrien County Solar + storage |
180 MW | In study |
| Wingstem Solar Energy Farm Solar |
150 MW | Paused / redesign |
| Battery storage project AI1-166, Cass County Battery storage |
150 MW | In study |
| Solar + storage project AH2-149, Van Buren County Solar + storage |
150 MW | In study |
| Gemstone Solar Solar |
150 MW | Agreement signed |
| Southwest Michigan Energy Center Solar |
100 MW | Agreement signed |
| Solar + storage project AH2-418, Berrien County Solar + storage |
100 MW | In study |
| Murch Solar Solar |
85.0 MW | Agreement signed |
| Solar project AI2-358, Van Buren County Solar |
70.0 MW | In study |
| Decatur Battery Storage Battery storage Β· Decatur Storage LLC |
50.0 MW | Agreement signed |
| Solar project AI2-144, St. Joseph County Solar |
36.0 MW | In study |
| Decatur Battery Storage Battery storage Β· Decatur Storage LLC |
25.0 MW | Agreement signed |
| Solar project AI2-169, Cass County Solar |
24.0 MW | In study |
| Solar project AI2-340, Van Buren County Solar |
23.1 MW | In study |
| Solar project AI2-215, Cass County Solar |
18.1 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)