United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in NYISO (New York) (2021 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| NY125A - Fort Covington Solar Solar Β· Fort Covington Solar LLC |
250 MW | In study |
| NY125B - Two Rivers Solar Solar Β· Two Rivers Solar Farm, LLC |
200 MW | In study |
| Agricola Wind Onshore wind Β· Agricola Wind LLC |
97.0 MW | In study |
| North Seneca Solar Project, LLC Solar Β· North Seneca Solar Project |
90.0 MW | In study |
| York Run Solar Solar Β· York Run Solar, LLC |
90.0 MW | In study |
| Holtsville Brookhaven Battery Storage Battery storage Β· Holtsville Brookhaven Battery Storage LLC |
79.9 MW | In study |
| Hoffman Falls Wind Onshore wind Β· Hoffman Falls Wind LLC |
72.0 MW | In study |
| Edwards Calverton Battery Storage Battery storage Β· Edwards Calverton Battery Storage |
60.0 MW | In study |
| Morris Solar Solar Β· Morris Solar NY LLC |
20.0 MW | In study |
| Sugar Maple Energy Storage Battery storage Β· Sugar Maple Solar |
20.0 MW | In study |
| BR Benson Mines Solar Solar Β· BR Project 1 LLC |
12.1 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)228 Β· 68.8 GW
- CAISO (California)138 Β· 66.9 GW
- ERCOT (Texas)207 Β· 39.5 GW
- MISO (Midcontinent)136 Β· 23.7 GW
- Southeast (non-ISO utilities)63 Β· 12.7 GW
- SPP (Southwest Power Pool)44 Β· 9,029 MW
- ISO-NE (New England)20 Β· 3,998 MW
- PJM (Mid-Atlantic, Midwest)49 Β· 2,072 MW
- NYISO (New York)11 Β· 991 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)