Interconnection queue in NYISO (New York) (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown11991 MW
Active in queue991 MW11 requests
Agreement signed0.0 MW0 requests
Withdrawn14923.5 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

11 requests
ProjectCapacityStatusLocationRegionQueuedOnline
NY125A - Fort Covington Solar
Solar Β· Fort Covington Solar LLC
250 MWIn study Franklin, NYNYISO May 2021target 2028
NY125B - Two Rivers Solar
Solar Β· Two Rivers Solar Farm, LLC
200 MWIn study St. Lawrence, NYNYISO May 2021target 2028
Agricola Wind
Onshore wind Β· Agricola Wind LLC
97.0 MWIn study Cayuga, NYNYISO Mar 2021target 2027
North Seneca Solar Project, LLC
Solar Β· North Seneca Solar Project
90.0 MWIn study Seneca, NYNYISO May 2021target 2027
York Run Solar
Solar Β· York Run Solar, LLC
90.0 MWIn study Chautauqua, NYNYISO Mar 2021target 2028
Holtsville Brookhaven Battery Storage
Battery storage Β· Holtsville Brookhaven Battery Storage LLC
79.9 MWIn study Suffolk, NYNYISO Sep 2021target 2026
Hoffman Falls Wind
Onshore wind Β· Hoffman Falls Wind LLC
72.0 MWIn study Madison, NYNYISO Jan 2021target 2027
Edwards Calverton Battery Storage
Battery storage Β· Edwards Calverton Battery Storage
60.0 MWIn study Suffolk, NYNYISO Sep 2021target 2026
Morris Solar
Solar Β· Morris Solar NY LLC
20.0 MWIn study St. Lawrence, NYNYISO Jan 2021target 2028
Sugar Maple Energy Storage
Battery storage Β· Sugar Maple Solar
20.0 MWIn study Jefferson, NYNYISO Aug 2021target 2026
BR Benson Mines Solar
Solar Β· BR Project 1 LLC
12.1 MWIn study St. Lawrence, NYNYISO May 2021target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)