United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in ERCOT (Texas) (2015 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Hickman Onshore wind Β· Invenergy |
300 MW | |
| Las Majadas Wind Onshore wind Β· EDF Renewable Energy |
273 MW | |
| Texas Solar Nova Solar Β· TEXAS SOLAR NOVA 1, LLC |
254 MW | |
| Hidalgo & Starr Wind Onshore wind Β· EDP Renewables |
250 MW | |
| Dermott Wind 1 Onshore wind Β· Lincoln Clean |
250 MW | |
| Denton Energy Center Gas Β· Denton Municipal Electric |
226 MW | |
| Reloj Del Sol Wind Onshore wind Β· EDP Renewables |
209 MW | |
| Karankawa Wind Onshore wind Β· Avangrid |
207 MW | |
| Venado Wind Onshore wind Β· Las Lomas Wind Energy, LLC |
202 MW | |
| Waymark Solar Solar Β· 174 Power Global |
182 MW | |
| RTS 2 Wind Onshore wind Β· Heart of Texas Wind, LLC |
180 MW | |
| RTS 1 Wind Onshore wind Β· Goldwind |
160 MW | |
| Peyton Creek Wind Onshore wind Β· RWE Renewables Development, LLC |
151 MW | |
| Cactus Flats Wind Onshore wind Β· Southern Power Company |
148 MW | |
| East Blackland Solar Solar + storage Β· East Blackland Holdings LLC |
144 MW | |
| Hudson (Ineos/Brazoria) Gas Β· Ineos |
96.0 MW | |
| Espiritu Wind Onshore wind Β· Acciona |
25.2 MW | |
| Nasa Gas Β· NASA |
12.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)43 Β· 9,562 MW
- SPP (Southwest Power Pool)32 Β· 6,042 MW
- PJM (Mid-Atlantic, Midwest)67 Β· 5,685 MW
- CAISO (California)20 Β· 5,339 MW
- West (non-ISO utilities)61 Β· 5,125 MW
- ERCOT (Texas)18 Β· 3,268 MW
- Southeast (non-ISO utilities)7 Β· 892 MW
- ISO-NE (New England)16 Β· 772 MW
- NYISO (New York)8 Β· 545 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)