Completed queue projects in ERCOT (Texas) (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown131,768 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn264,638 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

13 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Green Pastures W
Onshore wind Β· Capital Dynamics
300 MWOperating ERCOT Mar 20112015
Miami Wind 1 Project
Onshore wind Β· Invenergy, LLC
289 MWOperating ERCOT Jun 20112014
WKN Amadeus Wind
Onshore wind Β· WKN
250 MWOperating Fisher, TXERCOT Jan 20112021
Channel Energy Center 138/345kV CT
Gas Β· Calpine
194 MWOperating ERCOT Sep 20112014
Deer Park Energy Center
Gas Β· Calpine
190 MWOperating ERCOT Jul 20112014
Blue Summit Windfarm
Onshore wind Β· NextEra Energy
135 MWOperating ERCOT Mar 20112013
Anacacho Windfarm
Onshore wind Β· Eon Climate & Renewables
100 MWOperating ERCOT Mar 20112012
San Roman Wind 1
Onshore wind Β· Acciona Energy
94.0 MWOperating ERCOT Jun 20112017
Sendero Wind
Onshore wind Β· Exelon
78.0 MWOperating ERCOT Feb 20112015
WA Parish Addition
Gas Β· Petra Nova, LLC (NRG)
75.0 MWOperating ERCOT Nov 20112013
Notrees Battery Storage
Battery storage Β· Duke Energy Renewables, Inc
36.0 MWOperating ERCOT May 20112013
Rentech Project
Gas Β· Agrifos Fertilizer, Inc
16.0 MWOperating ERCOT Jun 20112014
LEVEE (Freeport LNG)
Gas Β· Freeport LNG
11.0 MWOperating Brazoria, TXERCOT Dec 20112019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)