GAS Β· ERCOTWA Parish Addition
WA Parish Addition is a 75.0 MW gas request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 12INR0086
- Grid region
- ERCOT (Texas)
- Developer
- Petra Nova, LLC (NRG)
- Connection point (POI)
- WAP_PNPI_GT2 (110020)
- Technology
- Gas: 75.0 MW
- Total requested
- 75.0 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 21 November 2011
- Agreement signed
- 7 December 2012
- Proposed online date
- June 2013
- Came online
- June 2013