| Project | Capacity | Status |
|---|---|---|
| Muon Solar + storage |
2,339 MW | In study |
| Stanley Solar + storage |
2,071 MW | In study |
| Quark Solar + storage |
2,045 MW | In study |
| Ripple Solar + storage |
1,880 MW | In study |
| Sunflower Solar + storage |
1,430 MW | In study |
| Broadview Solar + storage |
1,308 MW | In study |
| Matterhorn Other |
1,218 MW | In study |
| Solstice B Solar + storage |
1,211 MW | In study |
| Aviation Gas |
1,200 MW | In study |
| Pion Battery storage |
1,168 MW | In study |
| Solstice A Solar + storage |
1,111 MW | In study |
| Hillside Energy Storage Battery storage |
1,065 MW | In study |
| Musketeers Solar + storage |
1,047 MW | In study |
| Crusade Battery storage |
1,029 MW | In study |
| Lagoonez Battery storage |
1,029 MW | In study |
| Alisa Solar Energy Complex 2 Solar + storage |
1,000 MW | In study |
| Bristlecone Solar + storage |
921 MW | In study |
| Amanece Solar + storage |
836 MW | In study |
| Carissalito Creek Solar + storage |
832 MW | In study |
| Maravillosa 2 Solar + storage |
812 MW | In study |
| Stable Solar + storage |
750 MW | In study |
| Sunglow Solar + storage |
744 MW | In study |
| Sunvine Solar + storage |
614 MW | In study |
| Maestro Solar + storage |
609 MW | In study |
| Duran Gas |
600 MW | In study |
| Sienna 3 Solar + storage |
576 MW | In study |
| Soledad Solar Solar |
562 MW | In study |
| Domestic Chicken Solar |
559 MW | In study |
| East Wonder Solar + storage |
556 MW | In study |
| Summit Valley Energy Storage Battery storage |
519 MW | In study |
| Lupine Energy Center Battery storage |
518 MW | In study |
| Chronos Energy Storage Battery storage |
517 MW | In study |
| Yacht Rock Battery storage |
514 MW | In study |
| Dove Cove Battery storage |
514 MW | In study |
| Belterra Energy Storage Battery storage |
514 MW | In study |
| Fontus Battery storage |
514 MW | In study |
| Blue Star Solar + storage |
513 MW | In study |
| Bolt Solar + storage |
509 MW | In study |
| Torbino Solar Solar |
507 MW | In study |
| Galicia Storage Battery storage |
506 MW | In study |
| Ambar Energy Storage Battery storage |
505 MW | In study |
| Cantus Solar + storage |
499 MW | In study |
| Shoals Energy Storage 2 Battery storage |
461 MW | In study |
| Whiskey Diggings Solar |
414 MW | In study |
| Solstice C Solar + storage |
408 MW | In study |
| Solstice D Solar + storage |
408 MW | In study |
| Maravillosa 1 Solar + storage |
407 MW | In study |
| Tea Leaf Energy Storage Battery storage |
404 MW | In study |
| Gamay Solar + storage |
400 MW | In study |
| Comstock Gas |
398 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)309 Β· 110.9 GW
- ERCOT (Texas)356 Β· 76.0 GW
- CAISO (California)107 Β· 53.4 GW
- Southeast (non-ISO utilities)210 Β· 24.0 GW
- SPP (Southwest Power Pool)82 Β· 15.1 GW
- PJM (Mid-Atlantic, Midwest)156 Β· 14.6 GW
- MISO (Midcontinent)23 Β· 3,679 MW
- ISO-NE (New England)6 Β· 1,053 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)