Completed queue projects in CAISO (California) (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown392,837 MW
Active in queue333 MW3 requests
Agreement signed333 MW3 requests
Withdrawn16819.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

39 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Blythe Mesa Solar
Solar + storage
336 MWOperating Riverside, CACAISO Feb 20102022
Pio Pico Energy Center
Gas
308 MWOperating San Diego, CACAISO Feb 20102016
Re Tranquillity
Solar + storage
272 MWOperating Fresno, CACAISO Jul 20102022
Desert Harvest
Solar + storage
185 MWOperating Riverside, CACAISO Jul 20102020
Re Mustang
Solar + storage
175 MWOperating Kings, CACAISO Jul 20102021
Mesquite Solar 1 (Fka Mesquite Generation)
Solar
165 MWOperating Maricopa, AZCAISO Jul 20102014
Imperial Valley West
Solar
150 MWOperating Imperial, CACAISO Feb 20102016
Campo Verde Solar (Fka Uss Wixom Solar 1)
Solar
147 MWOperating Imperial, CACAISO Feb 20102013
Catalina Solar
Solar
145 MWOperating Kern, CACAISO Feb 20102022
Solar Star California Xiii (Quinto)
Solar
110 MWOperating Merced, CACAISO Feb 20102015
Henrietta Solar (Fka Sunpower Henrietta Solar)
Solar
100 MWOperating Kings, CACAISO Feb 20102016
Willow Springs 2
Solar
100 MWOperating Kern, CACAISO Jul 20102019
Regulus Solar (Fka FRV Regulus Solar)
Solar
60.0 MWOperating Kern, CACAISO Feb 20102014
North Star Solar 1
Solar
60.0 MWOperating Fresno, CACAISO Feb 20102015
Centinela Solar Energy Expansion (45 MW)
Solar
45.0 MWOperating Imperial, CACAISO Jul 20102014
Spi Anderson 2
Other
27.2 MWOperating CACAISO Jul 20102015
Russell City Energy Center FD3 Upgrade
Gas
25.0 MWOperating Alameda, CACAISO Feb 20102013
Adobe Solar (Fka FRV Adobe Solar)
Solar
20.0 MWOperating Kern, CACAISO May 20102014
Western Antelope Blue SKY Ranch A
Solar
20.0 MWOperating Los Angeles, CACAISO Dec 20102014
Kansas South
Solar
20.0 MWOperating Kings, CACAISO Jul 20102013
Wildwood Solar I (Fka Goose Lake Solar I)
Solar
20.0 MWOperating Kern, CACAISO Oct 20102015
Kansas
Solar
20.0 MWOperating Kings, CACAISO Jul 20102014
Jacumba Solar Farm
Solar
20.0 MWOperating San Diego, CACAISO Aug 20102017
Vega Solar (Fka: FRV Vega Solar)
Solar
20.0 MWOperating Kings, CACAISO Jan 20102015
Sierra Solar GWX (Fka Silver Sun Greenworks)
Solar
20.0 MWOperating Los Angeles, CACAISO Dec 20102015
Central Antelope Solar (Fka Western Antelope Blue SKY Ranch B)
Solar
20.0 MWOperating Los Angeles, CACAISO Dec 20102016
Kent South
Solar
20.0 MWOperating Kings, CACAISO Sep 20102014
West Antelope Solar (Fka: Ta - Acacia)
Solar
20.0 MWOperating Los Angeles, CACAISO Sep 20102014
Tracy - Additional Capacity
Gas
20.0 MWOperating San Joaquin, CACAISO Feb 20102012
Maricopa West Solar PV (Fka Copus Solar One)
Solar
20.0 MWOperating Kern, CACAISO Apr 20102015
Orion Solar I (Fka: FRV Orion Kern Solar)
Solar
20.0 MWOperating Kern, CACAISO May 20102014
Summer Wheat Solar Farm
Solar
20.0 MWOperating Fresno, CACAISO Jun 20102018
Chowchilla Solar Project
Solar
20.0 MWOperating Madera, CACAISO Aug 20102015
South Kern Solar PV Plant
Solar
20.0 MWOperating Kern, CACAISO Sep 20102015
White River 2 (Fka:White River West 19.75 MW PV Generation Facilty)
Solar
19.8 MWOperating Tulare, CACAISO Feb 20102014
Corcoran 2 Generating Facility (Fka: Corcoran West 19.75 MW PV Generation Facilty)
Solar
19.8 MWOperating Kings, CACAISO Feb 20102015
Adams East
Solar
19.0 MWOperating Fresno, CACAISO May 20102014
Westlands Solar Farm PV1
Solar
18.0 MWOperating Fresno, CACAISO Jun 20102014
Western Antelope DRY Ranch
Solar
10.0 MWOperating Los Angeles, CACAISO Oct 20102016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)