United States β€Ί Grid β€Ί Interconnection queues β€Ί Nevada

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Nevada, CAISO

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown158,076 MW
Active in queue16.7 GW31 requests
Agreement signed8,618 MW16 requests
Withdrawn8328.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

15 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Arida 2 Solar Farm
Solar + storage
1,400 MWIn study Clark, NVCAISO Apr 2019target 2029
Water Rock Solar 2
Solar + storage
1,034 MWIn study Nye, NVCAISO Apr 2021target 2028
Bristlecone
Solar + storage
921 MWIn study Nye, NVCAISO Apr 2023target 2030
Arida 3 Solar Farm
Solar + storage
900 MWIn study Clark, NVCAISO Apr 2020target 2030
Arida Solar Farm
Solar + storage
740 MWIn study Clark, NVCAISO Apr 2018target 2027
Larrea Solar
Solar + storage
614 MWIn study Clark, NVCAISO Apr 2021target 2028
Sterling
Solar + storage
500 MWIn study Clark, NVCAISO Apr 2021target 2031
Goldlink
Solar
354 MWIn study Nye, NVCAISO Apr 2023target 2030
Dandelion Hybrid Solar
Solar + storage
334 MWIn study Nye, NVCAISO Apr 2021target 2027
Serenity
Solar
305 MWIn study Nye, NVCAISO Apr 2023target 2031
Delamar Energy Storage 2
Battery storage
256 MWIn study Clark, NVCAISO Apr 2021target 2027
Container
Solar
205 MWIn study Nye, NVCAISO Apr 2023target 2031
Grapevine 1
Solar
205 MWIn study Nye, NVCAISO Apr 2023target 2031
Nelson Hills
Solar
205 MWIn study Nye, NVCAISO Apr 2023target 2031
Nelson
Solar
104 MWIn study Nye, NVCAISO Apr 2023target 2031

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)