Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Shawnee Generating Station (CT 1) Other |
1.0 MW | |
| Mountain Station Unit C2 Gas |
1.0 MW | |
| Orrtanna Station Unit C1 Other |
1.0 MW | |
| Magid Glove & Safety Mfg. Co Battery storage |
1.0 MW | |
| Tolna Unit 1 Other |
1.0 MW | |
| Shawville Generating Station Gas |
1.0 MW | |
| New Castle Generating Station Gas |
1.0 MW | |
| Hamilton Station Other |
1.0 MW | |
| Hydro project 574, Twin Falls County Hydro Β· Snake River Pottery Power Company, Inc |
0.9 MW | |
| Hydro project 548, Lemhi County Hydro Β· Coleman Hydro |
0.8 MW | |
| Pilesgrove Solar Solar |
0.8 MW | |
| Hydro project 564, Twin Falls County Hydro Β· David Snedigar |
0.5 MW | |
| Hydro project 1114, Marion County Hydro Β· Santiam Water Control District |
0.2 MW | |
| Hydro project 569, Gooding County Hydro Β· Birch Creek Hydro |
0.1 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)64 Β· 9,452 MW
- West (non-ISO utilities)39 Β· 5,477 MW
- MISO (Midcontinent)22 Β· 4,035 MW
- Southeast (non-ISO utilities)35 Β· 3,827 MW
- PJM (Mid-Atlantic, Midwest)75 Β· 3,202 MW
- CAISO (California)5 Β· 786 MW
- ISO-NE (New England)23 Β· 621 MW
- SPP (Southwest Power Pool)1 Β· 15.6 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)