United States › Grid › Interconnection queues › Pennsylvania
OTHER · PJMHamilton Station
Hamilton Station is a 1.0 MW other request built and operating in the PJM interconnection queue, in York County, Pennsylvania, connecting to ME.
Request details
- Queue ID
- AF1-194
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ME
- Connection point (POI)
- Hamilton CT1 115 kV
- Location
- York County, Pennsylvania
- Technology
- Oil: 1.0 MW
- Total requested
- 1.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 25 September 2019
- Proposed online date
- September 2023
- Came online
- July 2020
Location
Marker shows the centre of York County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in York County
- Peach Bottom Units #2 & #3Nuclear · 44.0 MW · agreement signed
- Battery storage project AH2-335, York CountyBattery storage · 130 MW · in study
- Strinestown Solar ProjectSolar · 79.6 MW · suspended
- Dover SolarSolar · 55.0 MW · suspended
- Dover SolarSolar · 20.0 MW · suspended
- Delta YorkGas · 760 MW · built
- DeltaGas · 550 MW · built
- Peach Bottom Units 2 & 3Nuclear · 206 MW · built
- Muddy RunHydro · 160 MW · built
- Peach Bottom - Units 2 & 3Nuclear · 140 MW · built
- Delta YorkGas · 120 MW · built
- Peach Bottom 2 & 3Nuclear · 70.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem