United States › Grid › Interconnection queues › Pennsylvania

NUCLEAR · PJM

Peach Bottom 2 & 3

Peach Bottom 2 & 3 is a 70.0 MW nuclear request built and operating in the PJM interconnection queue, in York County, Pennsylvania, connecting to PECO.

Queue statusOperating
  1. PlanningQueued Jul 2001 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingDec 2001 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
G46
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PECO
Connection point (POI)
Peach Bottom 500kV
Location
York County, Pennsylvania
Technology
Nuclear: 70.0 MW
Total requested
70.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
31 July 2001
Proposed online date
December 2001
Came online
December 2001

Location

Marker shows the centre of York County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in York County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem