United States › Grid › Interconnection queues › Pennsylvania
OTHER · PJMShawnee Generating Station (CT 1)
Shawnee Generating Station (CT 1) is a 1.0 MW other request built and operating in the PJM interconnection queue, in Monroe County, Pennsylvania, connecting to ME.
Request details
- Queue ID
- AF1-184
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ME
- Connection point (POI)
- Shawnee 1 34.5 kv
- Location
- Monroe County, Pennsylvania
- Technology
- Oil: 1.0 MW
- Total requested
- 1.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 25 September 2019
- Proposed online date
- September 2023
- Came online
- July 2020
Location
Marker shows the centre of Monroe County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Monroe County
- Swiftwater SolarSolar · 80.0 MW · agreement signed
- Other project AA1-017, Monroe CountyOther · 243 MW · withdrawn
- Other project AA1-016, Monroe CountyOther · 158 MW · withdrawn
- Solar + storage project AH2-152, Monroe CountySolar + storage · 44.8 MW · withdrawn
- Solar project AG1-283, Monroe CountySolar · 30.0 MW · withdrawn
- Battery storage project AE1-202, Monroe CountyBattery storage · 19.8 MW · withdrawn
- Shawnee Solar and BESSSolar + storage · 18.2 MW · withdrawn
- Solar project AG2-231, Monroe CountySolar · 10.0 MW · withdrawn
- Solar project AG2-185, Monroe CountySolar · 10.0 MW · withdrawn
- Solar project AG2-186, Monroe CountySolar · 5.2 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem