United States › Grid › Interconnection queues › Pennsylvania

SOLAR · PJM

Swiftwater Solar

Swiftwater Solar is a 80.0 MW solar request with a signed interconnection agreement in the PJM interconnection queue, in Monroe County, Pennsylvania, connecting to PPL.

Queue statusConsented
  1. PlanningQueued Mar 2019 (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2025 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
AE2-175
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PPL
Connection point (POI)
Jackson-Long Pond 69 kV
Location
Monroe County, Pennsylvania
Technology
Solar: 80.0 MW
Total requested
80.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Active
Entered queue
19 March 2019
Proposed online date
December 2025

Location

Marker shows the centre of Monroe County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Monroe County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem