United States βΊ Grid βΊ Interconnection queues βΊ Texas
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Texas (2021 requests) β page 5
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Midpoint Storage Battery storage Β· Midpoint Solar, LLC |
50.9 MW | Agreement signed |
| Findley Solar Solar + storage Β· Gransolar Texas Sixteen, LLC |
50.3 MW | In study |
| Makalu Solar Solar Β· Abei Energy Green X LLC |
50.2 MW | In study |
| Limewood Storage Solar + storage Β· Limewood Bell Renewables LLC |
50.0 MW | Agreement signed |
| Apogee Wind II Onshore wind Β· King Creek Wind Farm 3, LLC |
47.3 MW | In study |
| Braswell Solar Solar Β· Gransolar Texas Nine, LLC |
42.6 MW | In study |
| Rocinante BESS Solar + storage Β· Brush Country Solar Project, LLC |
33.2 MW | Agreement signed |
| Eagle Springs Storage Solar + storage Β· Eagle Springs Solar, LLC |
33.1 MW | Agreement signed |
| Enchanted Rock NEWPP Gas Β· Generate ER-NG, LLC |
30.0 MW | Agreement signed |
| Fowler Ranch Storage Battery storage Β· Crane BESS, LLC |
26.1 MW | In study |
| Midlothian 4 repower Gas Β· MIDLOTHIAN ENERGY, LLC |
18.0 MW | In study |
| Midlothian Unit 2 repower Gas Β· MIDLOTHIAN ENERGY, LLC |
18.0 MW | In study |
| Midlothian Unit 3 repower Gas Β· MIDLOTHIAN ENERGY, LLC |
18.0 MW | In study |
| Greater Bryant G Solar Solar Β· Greater Bryant G Solar, LLC |
17.7 MW | Agreement signed |
| Anchor Wind III Onshore wind Β· RANCHLAND WIND PROJECT LLC |
16.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)