United States › Grid › Interconnection queues › Maine

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in Maine — page 5

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown20419.0 GW
Active in queue1,030 MW16 requests
Agreement signed850 MW15 requests
Withdrawn20419.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

204 requests · page 5 of 5
ProjectCapacityStatusLocationRegionQueuedOnline
Wind Increase
Onshore wind
1.2 MWWithdrawn / abandoned Franklin, MEISO-NE Oct 2012target 2014
Hydro Uprate
Hydro
1.0 MWWithdrawn / abandoned Androscoggin, MEISO-NE Sep 2009target 2009
Solar
Solar
1.0 MWWithdrawn / abandoned Hancock, MEISO-NE Oct 2021target 2023
Wind Increase (see Q452)
Onshore wind
0.8 MWWithdrawn / abandoned Somerset, MEISO-NE Apr 2014target 2018
Page 5 of 5

Capacity in the queue by state

Click a state to drill down.

By grid region

ISO/RTO markets and the non-ISO West and Southeast.

Requests by year joined

Capacity of requests in this view, by the year they entered the queue. Click a year.

20102024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)