United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Completed queue projects in Southeast (non-ISO utilities) — page 4

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown529112.4 GW
Active in queue161.4 GW1,067 requests
Agreement signed37.8 GW192 requests
Withdrawn2,738603.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

529 requests · page 4 of 11
ProjectCapacityStatusLocationRegionQueuedOnline
Washington County Solar
Solar
150 MWOperating Washington, GASoutheast Aug 20182024
Solar project 297, Lincoln County
Solar
150 MWOperating Lincoln, TNSoutheast Jun 2016
Quitman Solar
Solar
150 MWOperating Brooks, GASoutheast 2019
Sandhills Solar Facility
Solar
143 MWOperating Taylor, GASoutheast 2017
SR DeSoto I
Solar
138 MWOperating Lee, GASoutheast Dec 20232022
Gas project 341
Gas
135 MWOperating Southeast Apr 20182018
Hydro project 1, Berkeley County
Hydro · SCPSA
128 MWOperating Berkeley, SCSoutheast Apr 2001target 2005
Robins AFB Solar
Solar
128 MWOperating Houston, GASoutheast 2021
SR Clay
Solar
125 MWOperating Clay, GASoutheast Dec 20232022
Gas project LGE-GIS-2009-001, Mccraken County
Gas
123 MWOperating Mccraken, KYSoutheast Feb 20092010
Gas project 223, Lowndes County
Gas
122 MWOperating Lowndes, MSSoutheast Apr 2010
Dougherty County Solar
Solar
120 MWOperating Dougherty, GASoutheast Dec 2023
SR Snipesville II
Solar
118 MWOperating Jeff Davis, GASoutheast Dec 2023
Gas project 317, Desoto County
Gas
115 MWOperating Desoto, MSSoutheast Jun 2017target 2018
Gas project 312, Benton County
Gas
115 MWOperating Benton, MSSoutheast Mar 2017
Gas project 330, Polk County
Gas · Duke Energy Florida, LLC
115 MWOperating Polk, FLSoutheast Jul 20232024
SR Arlington II
Solar
109 MWOperating Early, GASoutheast Dec 2023
Gas project 162
Gas
108 MWOperating Southeast Feb 20152019
Gas project 313
Gas
106 MWOperating Southeast Jul 20172018
Gas project 4903, Brunswick County
Gas · Sutton CT
104 MWOperating Brunswick, NCSoutheast Oct 20142017
SR Snipesville III
Solar
103 MWOperating Jeff Davis, GASoutheast Dec 20232023
Robins AFB Solar
Solar
101 MWOperating Houston, GASoutheast 2021
White Pine Solar
Solar
101 MWOperating Taylor, GASoutheast 2016
SR Lumpkin
Solar
100 MWOperating Stewart, GASoutheast Dec 2023
Solar project 341, Lowndes County
Solar
100 MWOperating Lowndes, MSSoutheast Mar 2018target 2023
Hawk Road (aka Dynegy)
Gas
100 MWOperating Heard, GASoutheast Dec 2023
Solar project 415, Lowndes County
Solar
100 MWOperating Lowndes, MSSoutheast Feb 2020target 2023
Sowega
Gas
100 MWOperating Mitchell, GASoutheast Dec 2023
Black Bear Solar
Solar
100 MWOperating Montgomery, ALSoutheast Sep 20182023
Solar project 377, Lowndes County
Solar
100 MWOperating Lowndes, MSSoutheast Jun 2019target 2023
Butler Solar
Solar
100 MWOperating Taylor, GASoutheast 2016
Solar project 342, Obion County
Solar
100 MWOperating Obion, TNSoutheast Mar 2018target 2022
Gas project 418, Miami-Dade County
Gas · FPL
99.0 MWOperating Miami-Dade, FLSoutheast Sep 20202025
Battery storage project 61
Battery storage
95.0 MWOperating Southeast Aug 20192021
Gas project 403, Morgan County
Gas
94.0 MWOperating Morgan, ALSoutheast Nov 2019target 2021
Other project 2, Berkeley County
Other · SCPSA
92.0 MWOperating Berkeley, SCSoutheast Apr 2001target 2005
SR Snipesville I
Solar
90.0 MWOperating Jeff Davis, GASoutheast Dec 2023
AMEA-Sylacauga
Gas
90.0 MWOperating Southeast 2004
Gas project 342
Gas
89.0 MWOperating Southeast Apr 20182018
Gas project 343
Gas
87.0 MWOperating Southeast Apr 20182018
Gas project 360C
Gas
87.0 MWOperating Southeast Dec 20182019
Gas project JEA-Q002, Duval County
Gas
84.4 MWOperating Duval, FLSoutheast Dec 2017target 2019
SR Ailey
Solar
80.0 MWOperating Montgomery, GASoutheast Oct 2019target 2024
Southern Oak Solar Energy Center Phase I
Solar
80.0 MWOperating Mitchell, GASoutheast 2020
Solar project 327, Colbert County
Solar
80.0 MWOperating Colbert, ALSoutheast Sep 2017
Blackwater Solar
Solar
80.0 MWOperating Ware, GASoutheast Oct 20182024
CPV Stagecoach Solar
Solar
80.0 MWOperating Macon, GASoutheast Jul 20202024
Lancaster Solar
Solar
80.0 MWOperating Calhoun, GASoutheast Dec 2023
East Atmore
Solar
80.0 MWOperating Escambia, ALSoutheast 2025
Solar project 286, Colbert County
Solar
80.0 MWOperating Colbert, ALSoutheast Mar 2016
Page 4 of 11

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)