United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in West (non-ISO utilities) — page 38

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,857519.1 GW
Active in queue519.1 GW1,857 requests
Agreement signed60.6 GW349 requests
Withdrawn5,277949.5 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,857 requests · page 38 of 38
ProjectCapacityStatusLocationRegionQueuedOnline
Hydro project 973, Franklin County
Hydro · City of Preston
0.4 MWAgreement signed Franklin, IDWest Nov 2017target 2018
Solar project G1066, Marion County
Solar
0.4 MWIn study Marion, ORWest Apr 2024target 2024
Gas project 41, Lincoln County
Gas
0.3 MWIn study Lincoln, WAWest Apr 2014target 2014
Battery storage project G1085, Flathead County
Battery storage
0.3 MWIn study Flathead, MTWest Aug 2025target 2025
Solar project TCS-38, Benton County
Solar · Oregon State University
0.3 MWAgreement signed Benton, ORWest Jul 2019target 2024
Solar project TCS-39, Benton County
Solar · Oregon State University
0.2 MWAgreement signed Benton, ORWest Jul 2019target 2024
Hydro project 755, Gem County
Hydro · Emmett Main Canal
0.1 MWAgreement signed Gem, IDWest Jan 2025target 2026
Page 38 of 38

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)