United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in the USA (2019 requests) β page 30
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project 25592, Lee County Solar |
2.0 MW | Withdrawn / abandoned |
| Solar project AE2-098, Warren County Solar |
1.9 MW | Withdrawn / abandoned |
| SHIELD Solar Solar Β· MERIT SI DEVELOPMENT, LLC |
1.9 MW | Withdrawn / abandoned |
| Hydro project TCS-49, Fremont County Hydro |
1.8 MW | Withdrawn / abandoned |
| Hydro project 1182, Fremont County Hydro |
1.8 MW | Withdrawn / abandoned |
| Hydro project 1158, Douglas County Hydro |
1.8 MW | Withdrawn / abandoned |
| Solar project AE2-083, Mercer County Solar |
1.6 MW | Withdrawn / abandoned |
| Solar project AE2-164, Bergen County Solar |
1.4 MW | Withdrawn / abandoned |
| Solar project TCS-35, Box Elder County Solar |
1.0 MW | Withdrawn / abandoned |
| Willow Brook Road Solar II Solar |
1.0 MW | Withdrawn / abandoned |
| Battery storage project AE2-063, Will County Battery storage |
1.0 MW | Withdrawn / abandoned |
| Solar project AE2-163, Essex County Solar |
1.0 MW | Withdrawn / abandoned |
| Solar project 1145, Box Elder County Solar |
1.0 MW | Withdrawn / abandoned |
| Solar project 1152, Utah County Solar |
0.7 MW | Withdrawn / abandoned |
| Solar project 1150, Benton County Solar |
0.5 MW | Withdrawn / abandoned |
| Solar project 1124, Deschutes County Solar |
0.4 MW | Withdrawn / abandoned |
| Solar project 1128, Jefferson County Solar |
0.4 MW | Withdrawn / abandoned |
| Solar project 1125, Deschutes County Solar |
0.4 MW | Withdrawn / abandoned |
| Solar project 1121, Wallowa County Solar |
0.4 MW | Withdrawn / abandoned |
| Solar project 1187, Grand County Solar |
0.3 MW | Withdrawn / abandoned |
| Solar project 1151, Benton County Solar |
0.3 MW | Withdrawn / abandoned |
| Solar project 1149, Benton County Solar |
0.1 MW | Withdrawn / abandoned |
| Snyder Wind Repower Onshore wind |
-15.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)247 Β· 41.2 GW
- CAISO (California)95 Β· 39.6 GW
- PJM (Mid-Atlantic, Midwest)409 Β· 38.5 GW
- Southeast (non-ISO utilities)199 Β· 37.4 GW
- MISO (Midcontinent)153 Β· 21.3 GW
- ERCOT (Texas)109 Β· 20.7 GW
- NYISO (New York)135 Β· 14.9 GW
- SPP (Southwest Power Pool)57 Β· 6,718 MW
- ISO-NE (New England)69 Β· 6,220 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)