United States › Grid › Interconnection queues › Texas

ONSHORE WIND · ERCOT

Snyder Wind Repower

Snyder Wind Repower is a -15.0 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Scurry County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedDec 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0257
Grid region
ERCOT (Texas)
Location
Scurry County, Texas
Technology
Wind: -15.0 MW
Total requested
-15.0 MW
Queue status
Withdrawn
Entered queue
27 March 2019
Withdrawn
December 2021

Location

Marker shows the centre of Scurry County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Scurry County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem