United States › Grid › Interconnection queues › Texas
ONSHORE WIND · ERCOTSnyder Wind Repower
Snyder Wind Repower is a -15.0 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Scurry County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedDec 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20INR0257
- Grid region
- ERCOT (Texas)
- Location
- Scurry County, Texas
- Technology
- Wind: -15.0 MW
- Total requested
- -15.0 MW
- Queue status
- Withdrawn
- Entered queue
- 27 March 2019
- Withdrawn
- December 2021
Location
Marker shows the centre of Scurry County; the queue data does not give exact sites.
Other requests in Scurry County
- Canyon WindOnshore wind · 309 MW · agreement signed
- Coyote WindOnshore wind · 243 MW · agreement signed
- Maldives SolarSolar · 184 MW · agreement signed
- Knapp BESSBattery storage · 10.0 MW · agreement signed
- Spectra SolarSolar · 1,200 MW · in study
- Zeus Scurry BESSSolar + storage · 1,043 MW · in study
- Zeus Scurry SolarSolar + storage · 504 MW · in study
- Cedar Draw SolarSolar + storage · 451 MW · in study
- Inadale BESSSolar + storage · 287 MW · in study
- Inadale SolarSolar + storage · 281 MW · in study
- Cedar Draw BESSSolar + storage · 226 MW · in study
- Fluvanna Max Solar SLFSolar + storage · 153 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem