United States βΊ Grid βΊ Interconnection queues βΊ Utah
SOLAR Β· WESTSolar project 1187, Grand County
Solar project 1187, Grand County is a 0.3 MW solar request withdrawn in the West interconnection queue, in Grand County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2019 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1187
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- SPA11 out of Spanish Valley substation
- Location
- Grand County, Utah
- Technology
- Solar: 0.3 MW
- Total requested
- 0.3 MW
- Service type
- Energy only (ERIS)
- Study phase
- REMOVED-LACK OF PROGRESS
- Queue status
- Withdrawn
- Entered queue
- 30 October 2019
- Proposed online date
- December 2020
Location
Marker shows the centre of Grand County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem