Queue requests in study in Utah — page 3

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown12929.7 GW
Active in queue33.8 GW154 requests
Agreement signed4,095 MW25 requests
Withdrawn64684.7 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

129 requests · page 3 of 3
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project 799, Box Elder County
Solar + storage · Steel Solar, LLC
67.0 MWPaused / redesign Box Elder, UTWest Sep 2016target 2023
Gas project PIS090, Utah County
Gas · PacifiCorp
62.0 MWIn study Utah, UTWest Oct 2024target 2026
Solar + storage project 642, Iron County
Solar + storage · Parowan Solar, LLC
58.0 MWIn study Iron, UTWest Feb 2015target 2024
Battery storage project S0014, Washington County
Battery storage
58.0 MWIn study Washington, UTWest Nov 2022target 2026
Gas project T2-014, Juab County
Gas · PacifiCorp
56.0 MWIn study Juab, UTWest Aug 2025target 2028
Gas project T2-019, Utah County
Gas · PacifiCorp
55.0 MWIn study Utah, UTWest Aug 2025target 2028
Solar + storage project C1-10, Emery County
Solar + storage · Emery Bull Creek Energy, LLC
45.0 MWPaused / redesign Emery, UTWest Apr 2021target 2029
Solar + storage project 862, Box Elder County
Solar + storage · Rocket Solar, LLC
45.0 MWPaused / redesign Box Elder, UTWest Apr 2017target 2019
Geothermal project C2-179, Millard County
Geothermal · FEC Development LLC
40.0 MWPaused / redesign Millard, UTWest May 2022target 2029
Gas project T2-018, Utah County
Gas · PacifiCorp
25.0 MWIn study Utah, UTWest Aug 2025target 2026
Solar + storage project T2-042, Millard County
Solar + storage
20.0 MWIn study Millard, UTWest Sep 2025target 2027
Solar + storage project T2-006, Tooele County
Solar + storage · PacifiCorp
20.0 MWIn study Tooele, UTWest Aug 2025target 2028
Solar + storage project T2-039, Emery County
Solar + storage
20.0 MWIn study Emery, UTWest Sep 2025target 2026
Solar + storage project T2-044, Millard County
Solar + storage
20.0 MWIn study Millard, UTWest Sep 2025target 2027
Solar + storage project T2-045, Millard County
Solar + storage
20.0 MWIn study Millard, UTWest Sep 2025target 2027
Solar + storage project T2-043, Millard County
Solar + storage
20.0 MWIn study Millard, UTWest Sep 2025target 2027
Battery storage project C2-209, Uintah County
Battery storage · Revolve Vernal BESS, LLC
20.0 MWPaused / redesign Uintah, UTWest May 2022target 2026
Geothermal project T2-004, Sevier County
Geothermal
20.0 MWIn study Sevier, UTWest Aug 2025
Solar + storage project T2-048, Millard County
Solar + storage
20.0 MWIn study Millard, UTWest Sep 2025target 2027
Geothermal project T2-005, Millard County
Geothermal
20.0 MWIn study Millard, UTWest Aug 2025
Geothermal project T2-003, Millard County
Geothermal
20.0 MWIn study Millard, UTWest Aug 2025
Solar + storage project T2-047, Millard County
Solar + storage
20.0 MWIn study Millard, UTWest Sep 2025target 2027
Solar + storage project T2-046, Millard County
Solar + storage
20.0 MWIn study Millard, UTWest Sep 2025target 2027
Gas project PIS091, Salt Lake County
Gas · PacifiCorp
17.0 MWIn study Salt Lake, UTWest Oct 2024target 2026
Solar project T2-058, Box Elder County
Solar
10.0 MWIn study Box Elder, UTWest Sep 2025
Gas project T2-015, Salt Lake County
Gas · PacifiCorp
7.0 MWIn study Salt Lake, UTWest Aug 2025target 2026
Wind + storage project C1-04, Salt Lake County
Wind + storage
6.0 MWIn study Salt Lake, UTWest Apr 2021target 2023
Geothermal project T2-012, Beaver County
Geothermal
3.6 MWIn study Beaver, UTWest Aug 2025target 2025
Onshore wind project C1-58, Salt Lake County
Onshore wind
2.0 MWIn study Salt Lake, UTWest May 2021target 2023
Page 3 of 3

Capacity in the queue by state

Click a state to drill down.

By grid region

ISO/RTO markets and the non-ISO West and Southeast.

Requests by year joined

Capacity of requests in this view, by the year they entered the queue. Click a year.

20132025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)