United States β€Ί Grid β€Ί Interconnection queues β€Ί California

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in California (2021 requests) β€” page 3

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown13653.2 GW
Active in queue53.2 GW136 requests
Agreement signed31.6 GW64 requests
Withdrawn21574.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

136 requests Β· page 3 of 3
ProjectCapacityStatusLocationRegionQueuedOnline
Buttercup Hybrid Solar
Solar + storage
197 MWIn study Merced, CACAISO Apr 2021target 2032
Black Diamond ES2
Battery storage
179 MWAgreement signed Contra Costa, CACAISO Apr 2021target 2031
Solar + storage project GI-2021-149, Imperial County
Solar + storage
175 MWIn study Imperial, CAWest Nov 2021target 2024
Bobor Storage
Battery storage
152 MWIn study Tulare, CACAISO Apr 2021target 2030
Flores Storage
Battery storage
152 MWIn study Madera, CACAISO Apr 2021target 2031
Battery storage project GI-2021-145, Riverside County
Battery storage
125 MWIn study Riverside, CAWest Aug 2021target 2027
El Rey Power Bank
Battery storage
124 MWIn study Monterey, CACAISO Apr 2021target 2029
Wildhorse Energy Center
Battery storage
122 MWIn study Sonoma, CACAISO Apr 2021target 2030
High Winds Storage
Battery storage
121 MWIn study Solano, CACAISO Apr 2021target 2031
Serena Storage
Battery storage
114 MWAgreement signed Kern, CACAISO Apr 2021target 2029
Sienna Solar 2
Solar + storage
112 MWIn study San Bernardino, CACAISO Apr 2021target 2029
Oakdale Storage
Battery storage
103 MWAgreement signed Stanislaus, CACAISO Apr 2021target 2029
Los Nietos
Battery storage
102 MWAgreement signed Orange, CACAISO Apr 2021target 2031
Arges BESS
Battery storage
102 MWIn study Solano, CACAISO Apr 2021target 2029
Pajaro Valley Storage
Battery storage
102 MWIn study San Diego, CACAISO Apr 2021target 2030
Tokay Storage
Battery storage
102 MWAgreement signed Santa Clara, CACAISO Apr 2021target 2030
Double Springs Energy Storage
Battery storage
101 MWAgreement signed Calaveras, CACAISO Apr 2021target 2029
Sunbeam Storage
Battery storage
101 MWAgreement signed San Mateo, CACAISO Apr 2021target 2034
Eiger Energy Storage
Battery storage
101 MWIn study Kern, CACAISO Apr 2021target 2032
Peaceful Hollow BESS
Battery storage
100 MWAgreement signed Fresno, CACAISO Apr 2021target 2028
Battery storage project 15, Sacramento County
Battery storage
100 MWIn study Sacramento, CAWest Dec 2021target 2027
Solar + storage project GI-2021-148, Imperial County
Solar + storage
90.0 MWIn study Imperial, CAWest Nov 2021target 2027
Valetudo Energy Storage
Battery storage
79.6 MWIn study Madera, CACAISO Apr 2021target 2028
Palmetto Energy Storage
Battery storage
75.6 MWIn study Alameda, CACAISO Apr 2021target 2030
Battery storage project GI-2021-146, Imperial County
Battery storage
75.0 MWIn study Imperial, CAWest Nov 2021target 2025
Solar + storage project GI-2021-147, Imperial County
Solar + storage
75.0 MWIn study Imperial, CAWest Nov 2021target 2024
Tarragon Hybrid
Solar + storage
71.9 MWIn study Fresno, CACAISO Apr 2021target 2028
Hammerhead Storage
Battery storage
71.3 MWIn study San Diego, CACAISO Apr 2021target 2030
Mayacamas Geothermal
Geothermal
53.0 MWIn study Sonoma, CACAISO Apr 2021target 2030
Geranium Energy Storage
Battery storage
51.4 MWIn study San Diego, CACAISO Apr 2021target 2029
Orleans
Solar + storage
51.1 MWAgreement signed Fresno, CACAISO Apr 2021target 2029
Township Power Bank
Battery storage
50.5 MWIn study Sutter, CACAISO Apr 2021target 2028
Verbena Energy Storage
Battery storage
50.5 MWIn study Sutter, CACAISO Apr 2021target 2028
Kifer BESS 1
Battery storage
50.0 MWIn study Santa Clara, CACAISO Apr 2021target 2025
Hidden Knolls BESS
Battery storage
30.8 MWIn study Kern, CACAISO Apr 2021target 2028
Other project GI-2021-144, Imperial County
Other
28.0 MWIn study Imperial, CAWest Mar 2021target 2028
Page 3 of 3

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)