United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in the USA (2018 requests) β page 29
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| South Jefferson Road Storage Battery storage |
2.0 MW | Withdrawn / abandoned |
| Solar project 19603, Greenwood County Solar |
2.0 MW | Withdrawn / abandoned |
| Solar project TCS-15, Yakima County Solar Β· OneEnergy Development, LLC |
2.0 MW | Withdrawn / abandoned |
| Solar project AE1-223, Burlington County Solar |
1.9 MW | Withdrawn / abandoned |
| Solar project 533, Twin Falls County Solar |
1.7 MW | Withdrawn / abandoned |
| Solar project AE1-011 Solar |
1.5 MW | Withdrawn / abandoned |
| Astoria Storage on Demand Battery storage Β· Consolidated Edison Co. of NY, Inc. |
1.5 MW | Withdrawn / abandoned |
| Hydro project LGE-GIS-2018-008, Estill County Hydro |
1.5 MW | Withdrawn / abandoned |
| 5203 Saint Barnabas Road Solar |
1.4 MW | Withdrawn / abandoned |
| Solar project AE1-082, Charles County Solar |
1.3 MW | Withdrawn / abandoned |
| Solar project AD2-064, Camden County Solar |
1.3 MW | Withdrawn / abandoned |
| Solar project AE1-016, Prince George's County Solar |
1.1 MW | Withdrawn / abandoned |
| Onshore wind project J1126, Tuscola County Onshore wind |
1.1 MW | Withdrawn / abandoned |
| Solar project G0594, Lane County Solar |
1.0 MW | Withdrawn / abandoned |
| Solar project AE1-043, Gloucester County Solar |
1.0 MW | Withdrawn / abandoned |
| Battery storage project AE1-048, Queen Anne's County Battery storage |
1.0 MW | Withdrawn / abandoned |
| Bethlehem Solar Solar Β· PSEG Power NY LLC |
1.0 MW | Withdrawn / abandoned |
| 4179 Suitland Road Solar |
0.9 MW | Withdrawn / abandoned |
| Solar project 1007, Wallowa County Solar |
0.9 MW | Withdrawn / abandoned |
| UD Motor Pool Battery storage |
0.8 MW | Withdrawn / abandoned |
| State Route 57 Solar Solar |
0.8 MW | Withdrawn / abandoned |
| Solar project AE1-014, Prince George's County Solar |
0.5 MW | Withdrawn / abandoned |
| 1724 64th Street Solar |
0.5 MW | Withdrawn / abandoned |
| Solar project 1026, Salt Lake County Solar |
0.4 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)306 Β· 50.5 GW
- PJM (Mid-Atlantic, Midwest)311 Β· 46.6 GW
- MISO (Midcontinent)165 Β· 28.2 GW
- Southeast (non-ISO utilities)248 Β· 28.2 GW
- CAISO (California)67 Β· 21.7 GW
- SPP (Southwest Power Pool)92 Β· 16.8 GW
- ERCOT (Texas)77 Β· 15.0 GW
- NYISO (New York)74 Β· 11.2 GW
- ISO-NE (New England)84 Β· 8,151 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)