BATTERY STORAGE Β· PJMBattery storage project AE1-048, Queen Anne's County
Battery storage project AE1-048, Queen Anne's County is a 1.0 MW battery storage request withdrawn in the PJM interconnection queue, in Queen Anne's County, Maryland, connecting to DPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2018 (completed)
- Withdrawn / abandonedAug 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE1-048
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DPL
- Connection point (POI)
- Wye Mills 25 kV
- Location
- Queen Anne's County, Maryland
- Technology
- Battery: 1.0 MW
- Total requested
- 1.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 17 July 2018
- Withdrawn
- August 2018
Location
Marker shows the centre of Queen Anne's County; the queue data does not give exact sites.
Other requests in Queen Anne's County
- Cedar Lane SolarSolar Β· 4.0 MW Β· agreement signed
- Battery storage project AG2-380, Queen Anne's CountyBattery storage Β· 20.0 MW Β· in study
- Solar project AI2-350, Queen Anne's CountySolar Β· 11.9 MW Β· in study
- Concho Solar ISolar Β· 49.0 MW Β· suspended
- Concho Solar ISolar Β· 20.0 MW Β· suspended
- Concho Solar ISolar Β· 17.0 MW Β· suspended
- Jones Farm Lane SolarSolar Β· 64.0 MW Β· built
- Pondtown Solar 2Solar Β· 20.0 MW Β· built
- Pondtown Solar 2Solar Β· 20.0 MW Β· built
- Pondtown Solar 1Solar Β· 19.8 MW Β· built
- Pondtown Solar 1Solar Β· 19.8 MW Β· built
- Church Hill Solar FarmSolar Β· 6.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem