United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in ERCOT (Texas) — page 29

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,408328.0 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,408 requests · page 29 of 29
ProjectCapacityStatusLocationRegionQueuedOnline
Hovey Solar 2
Solar · BARILLA SOLAR, LLC
7.5 MWIn study ERCOT Nov 2025target 2026
Roadrunner Crossing Wind (Uprate)
Wind + storage · Roadrunner Wind, LLC
3.3 MWIn study Eastland, TXERCOT Dec 2025target 2026
Ashra Storage SLF
Solar + storage · Ashra Solar, LLC
1.6 MWIn study Uvalde, TXERCOT Apr 2025target 2028
Kickstart Energy Storage IV
Battery storage · Kickstart Infrastructure LLC
1.4 MWIn study Ellis, TXERCOT Mar 2025target 2029
Kickstart Energy Storage III
Battery storage · Kickstart Infrastructure LLC
1.4 MWIn study Ellis, TXERCOT Mar 2025target 2029
Kickstart Energy Storage I
Battery storage · Kickstart Infrastructure LLC
1.4 MWIn study Ellis, TXERCOT Mar 2025target 2029
Kickstart Energy Storage II
Battery storage · Kickstart Infrastructure LLC
1.4 MWIn study Ellis, TXERCOT Mar 2025target 2029
Giga Austin Solar
Solar · GIGA TEXAS ENERGY LLC
-53.3 MWIn study Travis, TXERCOT Jul 2022target 2025
Page 29 of 29

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)