United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 28
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Tuolumne Meadows Battery storage |
103 MW | Withdrawn / abandoned |
| Horsetail Falls Battery storage |
103 MW | Withdrawn / abandoned |
| Maya Battery storage |
103 MW | Withdrawn / abandoned |
| Royal Solar Solar |
103 MW | Withdrawn / abandoned |
| Stephen Solar |
103 MW | Withdrawn / abandoned |
| Stirling Bridge 2 Es Battery storage |
103 MW | Withdrawn / abandoned |
| Mackerel Energy Solar + storage |
103 MW | Withdrawn / abandoned |
| Las Camas 2 Solar |
103 MW | Withdrawn / abandoned |
| Poleline Solar Energy Center Solar + storage |
102 MW | Withdrawn / abandoned |
| Kerrness Solar Solar |
102 MW | Withdrawn / abandoned |
| Aqueduct Energy Storage Battery storage |
102 MW | Withdrawn / abandoned |
| Ranger Battery storage |
102 MW | Withdrawn / abandoned |
| Elion Energy Storage 2 Battery storage |
102 MW | Withdrawn / abandoned |
| Rubita Solar |
102 MW | Withdrawn / abandoned |
| Drifter Energy Storage 2 Battery storage |
102 MW | Withdrawn / abandoned |
| North Bay Energy Storage 2 Battery storage |
102 MW | Withdrawn / abandoned |
| Noosa Energy Storage 2 Battery storage |
102 MW | Withdrawn / abandoned |
| Cayenne Energy Storage Battery storage |
102 MW | Withdrawn / abandoned |
| Lechon Battery storage |
102 MW | Withdrawn / abandoned |
| Driller Storage Battery storage |
102 MW | Withdrawn / abandoned |
| Paradise Peak Wind Power Project Onshore wind |
102 MW | Withdrawn / abandoned |
| Origin Energy Storage Battery storage |
102 MW | Withdrawn / abandoned |
| Trailways Energy Storage Battery storage |
102 MW | Withdrawn / abandoned |
| Mandorla (Formly Kirkwood Legacy Hybrid) Solar + storage |
102 MW | Withdrawn / abandoned |
| Meadows Energy Storage Battery storage |
102 MW | Withdrawn / abandoned |
| Conejo Solar Solar |
102 MW | Withdrawn / abandoned |
| Black Bear Energy Storage 1 Battery storage |
102 MW | Withdrawn / abandoned |
| Black Bear Energy Storage 2 Battery storage |
102 MW | Withdrawn / abandoned |
| Taylor Storage Battery storage |
102 MW | Withdrawn / abandoned |
| Duck Pilot Storage Battery storage |
102 MW | Withdrawn / abandoned |
| Coastwood Energy Storage Battery storage |
102 MW | Withdrawn / abandoned |
| Viking Energy Storage Battery storage |
102 MW | Withdrawn / abandoned |
| Estrada Storage Battery storage |
102 MW | Withdrawn / abandoned |
| Bay Sunshine Hybrid Solar Solar + storage |
102 MW | Withdrawn / abandoned |
| Aurum Mine Battery storage |
102 MW | Withdrawn / abandoned |
| Oakland Energy Reliability Center Battery storage |
102 MW | Withdrawn / abandoned |
| Fife Battery storage |
102 MW | Withdrawn / abandoned |
| King Flat Wind Farm 2 Onshore wind |
102 MW | Withdrawn / abandoned |
| Mammoth Energy Storage Battery storage |
101 MW | Withdrawn / abandoned |
| Tenacity Solar Solar |
101 MW | Withdrawn / abandoned |
| Herculis Battery storage |
101 MW | Withdrawn / abandoned |
| Elbrus Energy Storage Battery storage |
101 MW | Withdrawn / abandoned |
| Consecha Battery storage |
101 MW | Withdrawn / abandoned |
| Sheath Storage Battery storage |
101 MW | Withdrawn / abandoned |
| Ricochet Onshore wind |
101 MW | Withdrawn / abandoned |
| Hekla Energy Storage Battery storage |
101 MW | Withdrawn / abandoned |
| Garden Green Solar Solar + storage |
101 MW | Withdrawn / abandoned |
| Spanish Table Battery storage |
101 MW | Withdrawn / abandoned |
| Carbonera 1 Hybrid Solar Solar + storage |
101 MW | Withdrawn / abandoned |
| Amberjack Energy Storage Battery storage |
101 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)