United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in the USA (2014 requests) β page 14
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project AA1-022, Caroline County Solar |
1.5 MW | Withdrawn / abandoned |
| Westlands Solar Farms PV2 Solar |
1.5 MW | Withdrawn / abandoned |
| Battery storage project 39, Kitsap County Battery storage |
1.4 MW | Withdrawn / abandoned |
| Hydro Hydro |
1.3 MW | Withdrawn / abandoned |
| Solar project 565, Klamath County Solar Β· PacifiCorp Energy |
1.2 MW | Withdrawn / abandoned |
| Solar project 628, Salt Lake County Solar |
1.0 MW | Withdrawn / abandoned |
| Solar project 596, Beaver County Solar |
1.0 MW | Withdrawn / abandoned |
| Solar project 625, Sevier County Solar Β· South Valley Sustainability Park |
1.0 MW | Withdrawn / abandoned |
| Onshore wind project 570, Walla Walla County Onshore wind |
0.9 MW | Withdrawn / abandoned |
| Other project Z2-020, Summit County Other |
0.9 MW | Withdrawn / abandoned |
| Dovetail Biogas Facility Other |
0.9 MW | Withdrawn / abandoned |
| Wind Increase (see Q452) Onshore wind |
0.8 MW | Withdrawn / abandoned |
| Woodhull Solar Solar Β· ESA Solar NY, LLC |
0.7 MW | Withdrawn / abandoned |
| Hydro project 430, Twin Falls County Hydro |
0.6 MW | Withdrawn / abandoned |
| Solar project 546, Sevier County Solar |
0.5 MW | Withdrawn / abandoned |
| Potter Repowering Gas |
-21.2 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)77 Β· 22.8 GW
- PJM (Mid-Atlantic, Midwest)126 Β· 12.4 GW
- ERCOT (Texas)52 Β· 12.1 GW
- CAISO (California)70 Β· 10.2 GW
- West (non-ISO utilities)151 Β· 9,551 MW
- SPP (Southwest Power Pool)56 Β· 8,704 MW
- Southeast (non-ISO utilities)76 Β· 6,064 MW
- ISO-NE (New England)28 Β· 4,881 MW
- NYISO (New York)30 Β· 1,581 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)