United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in Texas — page 14
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Charro Creek Solar 2 SLF Solar + storage · Charro Creek Solar LLC |
203 MW | In study |
| Sunlight Solar Solar |
203 MW | Paused / redesign |
| Charro Creek Solar 3 SLF Solar + storage · Charro Creek Solar LLC |
203 MW | In study |
| Alexandrite Storage Battery storage · Johnson Energy Storage, LLC |
203 MW | In study |
| Gas project GEN-2022-147, Hale County Gas |
203 MW | In study |
| Masroor Storage Other · Masroor Energy Storage LLC |
203 MW | Paused / redesign |
| Bee Branch IA Battery storage · Tidwell Prairie LLC |
203 MW | In study |
| Soluce Cotton Solar Solar + storage · CTPB1, LLC |
203 MW | In study |
| Coati Energy Storage Battery storage · PowerPulse LLC |
203 MW | In study |
| Carolina Storage Odessa Battery storage · CSE Storage, LLC |
203 MW | In study |
| Techne BESS Battery storage · Techne BESS, LLC |
203 MW | In study |
| Legato BESS Battery storage · Legato Storage, LLC |
203 MW | In study |
| Fortissimo BESS Battery storage · Fortissimo BESS, LCC |
203 MW | In study |
| Saint Charles Energy Storage Battery storage · RSN STORAGE 001, LLC |
203 MW | In study |
| Ceres BESS Battery storage · Ceres BESS, LLC |
203 MW | In study |
| Prost ESS Battery storage · Prost ESS LLC |
203 MW | In study |
| Fiji Solar Solar |
203 MW | Paused / redesign |
| Elan BESS Battery storage · Elan BESS, LLC |
203 MW | In study |
| Bologna BESS Battery storage · MALONEY BESS LLC |
203 MW | In study |
| BRP Kabru BESS Battery storage · BRP Kabru BESS LLC |
203 MW | In study |
| BRP Kamet BESS Battery storage · BRP Kamet BESS LLC |
203 MW | In study |
| BRP Perseus BESS Battery storage · BRP Perseus BESS LLC |
203 MW | In study |
| Old Victory Energy Center Battery storage · Nova Clean Energy LLC |
203 MW | In study |
| Sanjac BESS Battery storage · Castleman Power |
202 MW | In study |
| Guajillo Wind Onshore wind · Guajillo Wind LLC |
202 MW | In study |
| BRP Nile BESS Battery storage · BRP Nile BESS LLC |
202 MW | In study |
| Gulf Prairie Solar Solar + storage · Gulf Prairie Energy LLC |
202 MW | In study |
| Carolina Storage Wichita Falls Battery storage · CSE Storage, LLC |
202 MW | In study |
| Tennuto BESS Battery storage · Tennuto BESS, LLC |
202 MW | In study |
| Pianissimo BESS II Battery storage · Pianissimo Storage, LLC |
202 MW | In study |
| Coda BESS Battery storage · Coda BESS, LLC |
202 MW | In study |
| Galaxy Storage 2 Battery storage · Galaxy Solar 2, LLC |
202 MW | In study |
| McMEXICO STORAGE Battery storage · FRESH AIR ENERGY II, LLC |
202 MW | In study |
| Hacienda Storage Battery storage · Galveston Energy Storage LLC |
202 MW | In study |
| Staccato BESS Battery storage · Staccato Storage, LLC |
202 MW | In study |
| Bluefox Solar 3 Solar · Industrial November Project LLC |
202 MW | In study |
| Altair Energy Storage Battery storage · Altair Energy Storage |
202 MW | In study |
| Avant Prairie BESS Battery storage · Avant Prairie ESS LLC |
202 MW | In study |
| Mitchell Plant Road Storage Battery storage |
202 MW | Paused / redesign |
| Spurland Solar II Solar · Spurland Solar II |
202 MW | In study |
| Texas Cotton Solar Solar · RWE Solar Development, LLC |
202 MW | In study |
| Cattleman Wind A Onshore wind · RWE Renewables Development, LLC |
202 MW | Paused / redesign |
| Cattleman Wind B Onshore wind · RWE Renewables Development, LLC |
202 MW | Paused / redesign |
| Mitchell Plant Road Solar Solar |
202 MW | Paused / redesign |
| Sun Angel ESS Battery storage · Sun Angel ESS LLC |
202 MW | In study |
| Soluce Cotton Storage Solar + storage · CTPB1,LLC |
202 MW | In study |
| Tex-Bar ESS Battery storage · Tex-Bar ESS LLC |
202 MW | In study |
| Exodus BESS Battery storage · Exodus Solar LLC |
201 MW | In study |
| Sawtooth Solar Solar · Sawtooth Solar, LLC |
201 MW | In study |
| Nockenut Springs Solar 3 Solar · Pecan Springs Energy, LLC |
201 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,398 · 327.9 GW
- SPP (Southwest Power Pool)61 · 16.6 GW
- MISO (Midcontinent)22 · 6,012 MW
- West (non-ISO utilities)5 · 997 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)