United States › Grid › Interconnection queues › Texas

SOLAR + STORAGE · ERCOT

Gulf Prairie Solar

Gulf Prairie Solar is a 202 MW solar + storage request in interconnection study in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusIn planning
  1. PlanningQueued Jun 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
27INR0449
Grid region
ERCOT (Texas)
Developer
Gulf Prairie Energy LLC
Connection point (POI)
(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or 2) on 345 kV circuit 18 between DOW (#42500) and Huizache (#46640)
Location
Brazoria County, Texas
Technology
Solar: 202 MW · Battery
Total requested
202 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
19 June 2025
Proposed online date
December 2028

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Brazoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem