Completed queue projects in ERCOT (Texas) — page 13

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown61395.3 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

613 requests · page 13 of 13
ProjectCapacityStatusLocationRegionQueuedOnline
Continental BESS
Other · Regis Continental, LLC
9.8 MWOperating Starr, TXERCOT May 20232024
Moore Field BESS 2
Other · Regis Monte Cristo LLC
9.8 MWOperating Hidalgo, TXERCOT Jul 20232024
Pirate BESS
Battery storage
9.8 MWOperating San Patricio, TXERCOT 2025
Falfur BESS
Battery storage · Regis Falfurrias, LLC
9.8 MWOperating Brooks, TXERCOT Jun 20232025
Fort Mason BESS
Other · Regis Mason LLC
9.8 MWOperating Mason, TXERCOT Aug 20232024
Texas Bluebonnet Solar
Solar · Texas Bluebonnet Solar Partners, LLC
9.7 MWOperating Mclennan, TXERCOT May 20232025
Wolf Ridge Repower
Onshore wind
9.0 MWOperating Cooke, TXERCOT Jun 20202023
Capricorn IV repower
Onshore wind
9.0 MWOperating Sterling, TXERCOT Aug 20172025
TPC Power
Gas · Walters Power
9.0 MWOperating ERCOT Mar 2014target 2015
Air Liquide Gulf Coast H2 Plant
Gas · Air Liquide
7.0 MWOperating ERCOT Jun 20092012
Damon BESS
Other
5.0 MWOperating Brazoria, TXERCOT 2024
Ebony Energy Storage Repowering
Battery storage
5.0 MWOperating Comal, TXERCOT Feb 20212025
Wolfe Flats Wind
Onshore wind · Wind Management, LLC
1.0 MWOperating ERCOT Aug 2006target 2007
Page 13 of 13

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)