WIND Β· OPERATIONAL

Chiplow

Chiplow is a 8.2 MW onshore wind farm in East of England, England, operated by Cubico Sustainable Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • East of England
  • England

Key facts

Installed capacity
8.2 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Cubico Sustainable Investments
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
PE31 8SR
Coordinates
52.8689, 0.6919

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Chiplow compares

358th of 488largest wind farms in the UK register
33rd of 48in East of England
0.03%of listed UK wind farms capacity
β‰ˆ 19 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 8.2 MW station would generate roughly 19 GWh of electricity in a year, similar to the annual use of about 6,920 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East of England All run by Cubico Sustainable Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
Blue Energy
Planning authority
King's Lynn and West Norfolk
Planning reference
10/00883/FM
Application submitted
26 May 2010
Permission granted
24 May 2012
Construction started
31 March 2015
Began operating
30 April 2016
Capacity in planning record
8.2 MW
Address
Bewteen the villages of Bagthorpe, Barmer and Syderstone in North West Norfolk, Norfolk
REPD reference
4657

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.