Carscreugh
Carscreugh is a 15.3 MW onshore wind farm in Scotland, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 15.3 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- RES Group
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- DG8 0NU
- Coordinates
- 54.8591, -4.7280
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Carscreugh compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 15.3 MW station would generate roughly 35 GWh of electricity in a year, similar to the annual use of about 12,910 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by RES GroupNearby generating sites
- Barlockhart Moor Wind Energy Ltd Β· 8.2 MW onshore wind farm3.9 km
- Glenchamber Wind Farm (GB) Β· 25.3 MW onshore wind farm9.0 km
- Artfield Fell Windfarm - A,C Β· 28.6 MW onshore wind farm12.1 km
- Airies Β· 39.9 MW onshore wind farm13.0 km
- Kilgallioch Β· 239 MW onshore wind farm23.1 km
- North Rhins Β· 22 MW onshore wind farm23.1 km
- Arecleoch Β· 120 MW onshore wind farm23.7 km
- Glen App Β· 22 MW onshore wind farm24.7 km
Also operated by RES Group
RES Group operates 98 sites in the register. Largest first:
- Beinneun Wind Farm Β· onshore wind farm109 MW
- Cumberhead Wind Farm Β· onshore wind farm50 MW
- Hill of Towie Wind Farm (GB) Β· onshore wind farm48.3 MW
- Crossdykes Wind Farm Β· onshore wind farm48 MW
- Blary Hill Β· onshore wind farm35 MW
- Tormywheel Β· onshore wind farm30.8 MW
- Garreg Llwyd (GB) Β· onshore wind farm30.4 MW
- Solwaybank Β· onshore wind farm30.4 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Carscreugh Renewable Energy Park
- Developer / operator
- John Laing Environmental Assets Group/ REG Power Management
- Planning authority
- Dumfries and Galloway
- Planning reference
- 06/P/1/0113
- Application submitted
- 1 May 2006
- Permission granted
- 3 May 2011
- Construction started
- 1 June 2013
- Began operating
- 15 January 2014
- Capacity in planning record
- 15.3 MW
- Address
- Gelnluce, nr Luce Bay Dumfries and Galloway, Dumfries and Galloway
- REPD reference
- 4501
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.