Glenchamber Wind Farm (GB)
Glenchamber Wind Farm (GB) is a 25.3 MW onshore wind farm in Scotland, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 25.3 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- RES Group
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- DG8 0PB
- Coordinates
- 54.9400, -4.7417
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Glenchamber Wind Farm (GB) compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 25.3 MW station would generate roughly 58 GWh of electricity in a year, similar to the annual use of about 21,340 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by RES GroupNearby generating sites
- Artfield Fell Windfarm - A,C Β· 28.6 MW onshore wind farm3.3 km
- Airies Β· 39.9 MW onshore wind farm4.2 km
- Barlockhart Moor Wind Energy Ltd Β· 8.2 MW onshore wind farm8.8 km
- Carscreugh Β· 15.3 MW onshore wind farm9.0 km
- Kilgallioch Β· 239 MW onshore wind farm14.0 km
- Arecleoch Β· 120 MW onshore wind farm14.7 km
- Glen App Β· 22 MW onshore wind farm18.7 km
- Mark Hill Β· 56 MW onshore wind farm20.9 km
Also operated by RES Group
RES Group operates 98 sites in the register. Largest first:
- Beinneun Wind Farm Β· onshore wind farm109 MW
- Cumberhead Wind Farm Β· onshore wind farm50 MW
- Hill of Towie Wind Farm (GB) Β· onshore wind farm48.3 MW
- Crossdykes Wind Farm Β· onshore wind farm48 MW
- Blary Hill Β· onshore wind farm35 MW
- Tormywheel Β· onshore wind farm30.8 MW
- Garreg Llwyd (GB) Β· onshore wind farm30.4 MW
- Solwaybank Β· onshore wind farm30.4 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Glenchamber Wind Farm
- Developer / operator
- Renewable Energy Systems (RES)
- Planning authority
- Dumfries and Galloway
- Planning reference
- 10/P/1/0494
- Application submitted
- 28 October 2010
- Permission granted
- 31 July 2012
- Construction started
- 6 February 2015
- Began operating
- 1 June 2016
- Capacity in planning record
- 27.5 MW
- Address
- between New Luce, Kirkcowan and Glenluce, Dumfries and Galloway
- REPD reference
- 4638
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.