Woodlands Farm

Woodlands Farm is a 13.2 MW solar farm in South East England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South East
  • England
Project stageOperating
  1. PlanningFeb 2014 (completed)
  2. ConsentedMay 2014 (completed)
  3. ConstructionNov 2014 (completed)
  4. OperatingMar 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
13.2 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
South East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CT3 4NB
Coordinates
51.3251, 1.1213

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Woodlands Farm compares

93rd of 662largest solar farms in the UK register
16th of 105in South East
0.23%of listed UK solar farms capacity
β‰ˆ 12 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 13.2 MW station would generate roughly 12 GWh of electricity in a year, similar to the annual use of about 4,270 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South East All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Woodlands Farm Solar Park
Developer / operator
Lightsource Renewable Energy
Planning authority
Canterbury
Planning reference
CA//14/00169
Application submitted
18 February 2014
Permission granted
7 May 2014
Construction started
24 November 2014
Began operating
30 March 2015
Capacity in planning record
10 MW
Address
Woodlands Farm, Calcott Hill, Sturry, Kent, CT3 4NB
REPD reference
1516

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.