SOLAR Β· OPERATIONAL

Mopley/Cadland

Mopley/Cadland is a 3.02 MW solar farm in South East England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South East
  • England
Project stageOperating
  1. PlanningApr 2013 (completed)
  2. ConsentedJul 2013 (completed)
  3. Construction (completed)
  4. OperatingFeb 2014 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
3.02 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
South East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SO45 1YH
Coordinates
50.8064, -1.3673

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Mopley/Cadland compares

579th of 662largest solar farms in the UK register
94th of 105in South East
0.05%of listed UK solar farms capacity
β‰ˆ 2.6 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 3.02 MW station would generate roughly 2.6 GWh of electricity in a year, similar to the annual use of about 980 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South East All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
The Manor of Cadland Estate - extension
Developer / operator
Manor of Cadland
Planning authority
New Forest
Planning reference
13/98465
Application submitted
30 April 2013
Permission granted
18 July 2013
Began operating
7 February 2014
Capacity in planning record
3 MW
Address
NEWHOUSE FIELD, WHITEFIELD FARM, LANGLEY, HAMPSHIRE, SO45 1YH, Hampshire
REPD reference
1669

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.