πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Michaelston Solar Farm

Michaelston Solar Farm is a 4.17 MW solar farm in Wales, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Wales
Project stageOperating
  1. PlanningApr 2014 (completed)
  2. ConsentedOct 2015 (completed)
  3. ConstructionDec 2015 (completed)
  4. OperatingFeb 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.17 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CF3 6XS
Coordinates
51.5467, -3.1118

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Michaelston Solar Farm compares

522nd of 662largest solar farms in the UK register
60th of 75in Wales
0.07%of listed UK solar farms capacity
β‰ˆ 3.7 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.17 MW station would generate roughly 3.7 GWh of electricity in a year, similar to the annual use of about 1,350 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Wales All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Newport (Began Road)
Developer / operator
Eco Energy World
Planning authority
Newport
Planning reference
14/0337
Application submitted
3 April 2014
Permission granted
22 October 2015
Construction started
14 December 2015
Began operating
14 February 2016
Capacity in planning record
4.9 MW
Address
Fairwater Farm, Michaelston-y-Fedw, Gwent, CF3 6XS
REPD reference
5866

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026