Michaelston Solar Farm
Michaelston Solar Farm is a 4.17 MW solar farm in Wales, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- Wales
Key facts
- Installed capacity
- 4.17 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- Wales
- Country
- Wales
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- CF3 6XS
- Coordinates
- 51.5467, -3.1118
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Michaelston Solar Farm compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.17 MW station would generate roughly 3.7 GWh of electricity in a year, similar to the annual use of about 1,350 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in Wales All run by AnescoNearby generating sites
- Cardiff Β· 2.3 MW onshore wind farm4.5 km
- Cwrt Henllys Β· 4.99 MW solar farm8.4 km
- Hill Farm Β· 7.69 MW solar farm9.7 km
- Severn Power Ltd Β· 850 MW CCGT gas power station10.3 km
- Singrug Β· 12 MW solar farm10.6 km
- Uskmouth Power Station Β· 363 MW coal-fired power station11.7 km
- Park Farm West Β· 3.93 MW solar farm11.9 km
- Maes Bach Β· 4.56 MW solar farm12.6 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Newport (Began Road)
- Developer / operator
- Eco Energy World
- Planning authority
- Newport
- Planning reference
- 14/0337
- Application submitted
- 3 April 2014
- Permission granted
- 22 October 2015
- Construction started
- 14 December 2015
- Began operating
- 14 February 2016
- Capacity in planning record
- 4.9 MW
- Address
- Fairwater Farm, Michaelston-y-Fedw, Gwent, CF3 6XS
- REPD reference
- 5866
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.