Derriton (Tamar Heights)
Derriton (Tamar Heights) is a 11.7 MW solar farm in South West England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 11.7 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- RES Group
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- EX22 6JX
- Coordinates
- 50.8026, -4.3678
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Derriton (Tamar Heights) compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 11.7 MW station would generate roughly 10 GWh of electricity in a year, similar to the annual use of about 3,800 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by RES GroupNearby generating sites
- Great Knowles Β· 2.92 MW solar farm0.7 km
- NOR Parsonage Wood Β· 4.18 MW solar farm2.3 km
- Eastacombe Β· 3.58 MW solar farm4.0 km
- Bradford Β· 5.29 MW solar farm5.7 km
- Northmoor Β· 4.91 MW solar farm8.2 km
- Whiddon Farm Β· 0.9 MW solar farm8.5 km
- Hornacott Β· 5 MW solar farm8.5 km
- East Langford Solar Β· 5 MW solar farm8.6 km
Also operated by RES Group
RES Group operates 98 sites in the register. Largest first:
- Beinneun Wind Farm Β· onshore wind farm109 MW
- Cumberhead Wind Farm Β· onshore wind farm50 MW
- Hill of Towie Wind Farm (GB) Β· onshore wind farm48.3 MW
- Crossdykes Wind Farm Β· onshore wind farm48 MW
- Blary Hill Β· onshore wind farm35 MW
- Tormywheel Β· onshore wind farm30.8 MW
- Garreg Llwyd (GB) Β· onshore wind farm30.4 MW
- Solwaybank Β· onshore wind farm30.4 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Derriton Fields Solar Farm
- Developer / operator
- Sunsave 12 (Derriton Fields) Limited./ Vogt solar
- Planning authority
- Torridge
- Planning reference
- 1/0978/2012/FULM
- Application submitted
- 6 November 2012
- Permission granted
- 5 February 2013
- Construction started
- 13 January 2014
- Began operating
- 31 March 2014
- Capacity in planning record
- 11.8 MW
- Address
- Derriton Fields Farm Holsworthy Devon, Devon, EX22 6JX
- REPD reference
- 1648
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.