SOLAR Β· OPERATIONAL

Derriton (Tamar Heights)

Derriton (Tamar Heights) is a 11.7 MW solar farm in South West England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South West
  • England
Project stageOperating
  1. PlanningNov 2012 (completed)
  2. ConsentedFeb 2013 (completed)
  3. ConstructionJan 2014 (completed)
  4. OperatingMar 2014 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
11.7 MW
Status
Operational
Technology
Solar Β· PV
Operator
RES Group
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
EX22 6JX
Coordinates
50.8026, -4.3678

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Derriton (Tamar Heights) compares

113th of 662largest solar farms in the UK register
21st of 192in South West
0.21%of listed UK solar farms capacity
β‰ˆ 10 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 11.7 MW station would generate roughly 10 GWh of electricity in a year, similar to the annual use of about 3,800 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Derriton Fields Solar Farm
Developer / operator
Sunsave 12 (Derriton Fields) Limited./ Vogt solar
Planning authority
Torridge
Planning reference
1/0978/2012/FULM
Application submitted
6 November 2012
Permission granted
5 February 2013
Construction started
13 January 2014
Began operating
31 March 2014
Capacity in planning record
11.8 MW
Address
Derriton Fields Farm Holsworthy Devon, Devon, EX22 6JX
REPD reference
1648

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026