Bradford
Bradford is a 5.29 MW solar farm in South West England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 5.29 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Octopus Investments
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- EX22 6LQ
- Coordinates
- 50.7807, -4.4415
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Bradford compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5.29 MW station would generate roughly 4.6 GWh of electricity in a year, similar to the annual use of about 1,720 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by Octopus InvestmentsNearby generating sites
- Northmoor Β· 4.91 MW solar farm3.4 km
- NOR Parsonage Wood Β· 4.18 MW solar farm3.4 km
- Great Knowles Β· 2.92 MW solar farm5.2 km
- Derriton (Tamar Heights) Β· 11.7 MW solar farm5.7 km
- Hornacott Β· 5 MW solar farm6.0 km
- Eastacombe Β· 3.58 MW solar farm7.5 km
- Grange Farm Β· 5.8 MW solar farm7.9 km
- East Langford Solar Β· 5 MW solar farm10.0 km
Also operated by Octopus Investments
Octopus Investments operates 134 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Bradford Solar Park
- Developer / operator
- Wessex Solar Energy
- Planning authority
- Torridge
- Planning reference
- 1/0035/2011/FULM
- Application submitted
- 10 June 2011
- Permission granted
- 14 December 2011
- Construction started
- 10 December 2012
- Began operating
- 21 March 2013
- Capacity in planning record
- 5.3 MW
- Address
- Land At Bradford Manor Farm Pyworthy Devon, Devon
- REPD reference
- 1158
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.