SOLAR Β· OPERATIONAL

Bake Farm

Bake Farm is a 5 MW solar farm in Scotland, operated by Cubico Sustainable Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Scotland
Project stageOperating
  1. PlanningJun 2015 (completed)
  2. ConsentedSep 2015 (completed)
  3. ConstructionJan 2016 (completed)
  4. OperatingMar 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5 MW
Status
Operational
Technology
Solar Β· PV
Operator
Cubico Sustainable Investments
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
DD11 2QZ
Coordinates
50.4057, -4.3510

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Bake Farm compares

252nd of 662largest solar farms in the UK register
3rd of 9in Scotland
0.09%of listed UK solar farms capacity
β‰ˆ 4.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Scotland All run by Cubico Sustainable Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Land At Bake Farm
Developer / operator
Murex Energy
Planning authority
Cornwall
Planning reference
PA15/04793
Application submitted
19 June 2015
Permission granted
1 September 2015
Construction started
21 January 2016
Began operating
31 March 2016
Capacity in planning record
5 MW
Address
Land At Bake Farm, Bake Lane, Trerulefoot, Saltash, Cornwall, Cornwall, PL12 5
REPD reference
5485

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.