πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Home β€Ί Grid infrastructure β€Ί Connection queue

NESO TEC REGISTER Β· GREAT BRITAIN

Grid connection projects in the connection queue on the Offshore transmission owner network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown154.2 GW in total
In planning0scoping or awaiting consent
Consented or building0closest to connecting
Built15connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

15 projects
ProjectCapacityStageConnection siteFrom
London Array Offshore Wind Farm
Offshore wind Β· London Array Limited
630 MWBuilt London Array 33/150kV Offshore Substations
Offshore transmission owner
Gwynt Y Mor Offshore Wind Farm
Offshore wind Β· Gwynt Y Mor Offshore Wind Farm Limited
574 MWBuilt Gwynt y Mor 132/33kV Offshore Substation
Offshore transmission owner
Greater Gabbard Offshore Wind Farm
Offshore wind Β· Greater Gabbard Offshore Winds Limited
500 MWBuilt Gabbard 33/132kV Offshore Substation
Offshore transmission owner
West of Duddon Sands Offshore Wind Farm
Offshore wind Β· Morecambe Wind Limited
382 MWBuilt West of Duddon Sands 34/155kV Offshore Substation
Offshore transmission owner
Sheringham Shoal Offshore Wind Farm
Offshore wind Β· Scira Offshore Energy Limited
315 MWBuilt Sheringham Shoal 33/132kV Offshore Substations
Offshore transmission owner
Thanet Offshore Wind Farm
Offshore wind Β· Thanet Offshore Wind Limited
300 MWBuilt Thanet 33/132kV Offshore Substation
Offshore transmission owner
Lincs Offshore Wind Farm
Offshore wind Β· Lincs Wind Farm Limited
265 MWBuilt Lincs 33/132kV Offshore Substation
Offshore transmission owner
Humber Gateway Offshore Wind Farm
Offshore wind Β· Rwe Renewables UK Humber Wind Limited
220 MWBuilt Humber Gateway 33/132kV Offshore Substation
Offshore transmission owner
Westermost Rough Offshore Wind Farm
Offshore wind Β· Westermost Rough Limited
207 MWBuilt Westermost Rough Offshore Substation
Offshore transmission owner
Walney I Offshore Wind Farm
Offshore wind Β· Walney (UK) Offshore Windfarms Limited
182 MWBuilt Walney 1 33/132kV Offshore Substation
Offshore transmission owner
Walney II Offshore Wind Farm
Offshore wind Β· Walney (UK) Offshore Windfarms Limited
182 MWBuilt Walney 2 33/132kV Substation
Offshore transmission owner
Ormonde Offshore Wind Farm
Offshore wind Β· Ormonde Energy Limited
150 MWBuilt Ormonde 33/132kV Offshore Substation
Offshore transmission owner
Robin Rigg West Offshore Wind Farm
Offshore wind Β· Rwe Renewables UK Robin Rigg West Limited
92 MWBuilt Robin Rigg West Offshore Wind Farm Substation
Offshore transmission owner
Barrow Offshore Wind Farm
Offshore wind Β· Barrow Offshore Wind Limited
90 MWBuilt Barrow 132/33kV Offshore Substation
Offshore transmission owner
Robin Rigg East Offshore Wind Farm
Offshore wind Β· Rwe Renewables UK Robin Rigg East Limited
86 MWBuilt Robin Rigg East 132/33kV Offshore Substation
Offshore transmission owner

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.