🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Offshore wind

OFFSHORE WIND · OFTO

Westermost Rough Offshore Wind Farm

Westermost Rough Offshore Wind Farm is a 207 MW offshore wind project built and connected, connecting to the Offshore transmission owner network at Westermost Rough Offshore Substation. The connection agreement is held by Westermost Rough Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000223
Customer
Westermost Rough Limited
Technology
Wind Offshore
Total capacity
207 MW
Already connected
207 MW
Connection site
Westermost Rough Offshore Substation
Transmission owner
Offshore transmission owner
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The connection site could not be placed on the map.

Projects connecting near Westermost Rough Offshore Substation · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem