Wind + storage projects in the connection queue on the National Grid (England & Wales) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown122.5 GW in total
In planning12scoping or awaiting consent
Consented or building0closest to connecting
Built0connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

12 projects
ProjectCapacityStageConnection siteFrom
ER TWD Energy
Wind + storage Β· Er Project Development Co Limited
700 MWScoping Llanteg 400kV Substation
National Grid (England & Wales)
Sep 2037
Lightsource Bagots Farm
Wind + storage Β· Lightsource Renewable UK Development Limited
240 MWScoping Derbyshire Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2037
Lightsource Folly Farm
Wind + storage Β· Lightsource Renewable UK Development Limited
240 MWScoping Severn Connection Node A 400kv Substation
National Grid (England & Wales)
Oct 2037
Lightsource New Eggborough
Wind + storage Β· Lightsource Renewable UK Development Limited
240 MWScoping Leeds North Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Lightsource Willington
Wind + storage Β· Lightsource Renewable UK Development Limited
240 MWScoping Derbyshire Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2037
Lightsourcebp Wakeleys Wind and BESS
Wind + storage Β· Lightsource Renewable UK Development Limited
240 MWScoping Derbyshire Connection Node G 400kV
National Grid (England & Wales)
Oct 2037
Garn Fach Wind Farm
Wind + storage Β· Edf Energy Renewables Limited
162 MWScoping Mid Wales Connection Node A 400Kv Substation
National Grid (England & Wales)
Oct 2037
Afan Wind Farm and BESS
Wind + storage Β· TRYDAN GWYRDD CYMRU (Welsh Government) Ltd
150 MWScoping South Wales West Connection Node A 132Kv Substation
National Grid (England & Wales)
Dec 2036
Brechfa Dau Wind Farm
Wind + storage Β· TRYDAN GWYRDD CYMRU (Welsh Government) Ltd
111 MWScoping Llandyfaelog 132kV Substation
National Grid (England & Wales)
Dec 2036
Mynydd Y Gwynt
Wind + storage Β· Edf Energy Renewables Limited
100 MWScoping Mid Wales Connection Node A 400Kv Substation
National Grid (England & Wales)
Oct 2037
Foel Fach Wind Farm
Wind + storage Β· Foel Fach Wind Farm Limited
79 MWScoping North Wales connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Balgray Wind Farm
Wind + storage Β· Fred Olsen Renewables Limited
43 MWScoping Dumfries North 400/132kV substation
National Grid (England & Wales)
Oct 2037

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.