NESO TEC REGISTER Β· GREAT BRITAIN

Battery storage projects in the connection queue on the SSEN Transmission (north Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown4249 MW in total
In planning91scoping or awaiting consent
Consented or building16closest to connecting
Built4connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

4 projects
ProjectCapacityStageConnection siteFrom
Zenobe Blackhillock 300 MW
Battery storage Β· Zenobe Blackhillock Limited
200 MWBuilt Blackhillock 275kV Substation
SSEN Transmission (north Scotland)
Jamesfield Farm Battery Storage
Battery storage Β· Harmony Jf Limited
30 MWBuilt Abernethy GSP
SSEN Transmission (north Scotland)
Jamesfield Farm Phase 2 Battery Storage
Battery storage Β· Harmony Jf Limited
19 MWBuilt Abernethy GSP
SSEN Transmission (north Scotland)
Keith 132 Greener Grid Park
Battery storage Β· Keith Storage Solutions Limited
0 MWBuilt Keith 132kV Substation
SSEN Transmission (north Scotland)

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.