NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown1,590616.3 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

1,590 projects · page 11 of 32
ProjectCapacityStageConnection siteFrom
Glenside Farm BESS
Battery storage · GPC 1211 Ltd
400 MWScoping Denny North 275/132kV
SP Transmission (south Scotland)
Oct 2031
Gresham House Gretna BESS
Battery storage · Albusia Ltd
400 MWScoping Gresham House Gretna 400/132kv Substation
SP Transmission (south Scotland)
Oct 2031
Hams Hall Green Energy Centre
Solar + storage · Hams Hall Ng Limited
400 MWScoping Hams Hall 400kV Substation
National Grid (England & Wales)
Oct 2028
Harker Green Energy Centre
Solar + storage · Blackdyke BESS Limited
400 MWAwaiting Consents Harker 400kV Substation
National Grid (England & Wales)
Oct 2028
Heckington Fen Solar Park
Solar + storage · Ecotricity (Heck Fen Solar) Limited
400 MWScoping Bicker Fen 400kV Substation
National Grid (England & Wales)
Oct 2028
HECWE Dungavel Wind Farm
Solar + storage · Spirebush Ltd
400 MWAwaiting Consents Spirebush 132kV Substation
SP Transmission (south Scotland)
Jul 2028
Heysham Green Energy Centre
Solar + storage · Heysham Green Ng Limited
400 MWAwaiting Consents Middleton 400KV Substation
National Grid (England & Wales)
Oct 2028
High Marnham 400
Solar + storage · Enso Green Holdings X Limited
400 MWAwaiting Consents High Marnham 400kV Substation
National Grid (England & Wales)
Oct 2033
High Marnham 400MW Field BESS
Battery storage · Field High Marnham Ltd
400 MWScoping Trent Valley South Connection Node G 400kV Substation
National Grid (England & Wales)
Oct 2039
Hope Battery Storage
Battery storage · Ibv Brinkburn Energy Park Limited
400 MWScoping Blyth 400kV Substation
National Grid (England & Wales)
Oct 2036
Hurlet Battery
Battery storage · P-Frequency Ltd
400 MWScoping Neilston 400kV Substation
SP Transmission (south Scotland)
Oct 2033
Ironbridge Green Energy Centre
Solar + storage · Ironbridge Green Ng Limited
400 MWAwaiting Consents Ironbridge 400kV Substation
National Grid (England & Wales)
Oct 2029
Kearsley North Green Energy Centre
Solar + storage · Kearsley North Green NG Limited
400 MWScoping Kearsley 275kV Substation
National Grid (England & Wales)
Oct 2028
Keith BESS Station
Battery storage · Ibv Coachford Energy Park Ltd
400 MWScoping Blackhillock substation
SSEN Transmission (north Scotland)
Oct 2033
Kelloe Mains
Battery storage · Tbc 003 Limited
400 MWScoping Kelloe Mains 400kV Substation
SP Transmission (south Scotland)
Nov 2029
Kingsnorth Power Station
Solar + storage · Qe Kingsnorth Spv Limited
400 MWScoping Kingsnorth B 400Kv Substation
National Grid (England & Wales)
Oct 2032
Kirkby Green Energy Centre
Solar + storage · Kirkby Green Ng Limited
400 MWScoping Kirkby 275kV Substation
National Grid (England & Wales)
Oct 2028
Lagrae Battery Storage
Battery storage · Lagrae Battery Storage Limited
400 MWScoping Glenmuckloch 132kV Substation
SP Transmission (south Scotland)
Oct 2036
Langage 400
Solar + storage · Enso Green Holdings X Limited
400 MWScoping Langage 400kV Substation
National Grid (England & Wales)
Oct 2038
Lawfield and Branxton Energy Park
Battery storage · Cairn Duhie Energy Limited
400 MWScoping Lawfield and Branxton Energy Park 400kV Substation
SP Transmission (south Scotland)
Jun 2028
Legacy 400
Solar + storage · Enso Green Holdings Limited
400 MWScoping Legacy 400kV Substation
National Grid (England & Wales)
Oct 2037
Legacy Green Energy Centre
Battery storage · Legacy Green Energy Limited
400 MWAwaiting Consents Legacy 400kV Substation
National Grid (England & Wales)
Oct 2027
Lightsource Auchans
Battery storage · Lightsource Renewable UK Development Limited
400 MWScoping Linwood 400kV Substation
SP Transmission (south Scotland)
Oct 2033
Littlebrook GEC (Ethos Green)
Solar + storage · Littlebrook Green Energy Centre Ltd
400 MWAwaiting Consents Rowdown 400kV Substation
National Grid (England & Wales)
Oct 2031
Long Stratton 400
Solar + storage · Enso Green Holdings X Limited
400 MWScoping North Anglia Connection Node A 400kV
National Grid (England & Wales)
Oct 2034
Long Stratton BESS
Battery storage · Field Long Stratton Ltd
400 MWScoping North Anglia Connection Node A 400kV
National Grid (England & Wales)
Oct 2034
Low Harker BESS
Solar + storage · Energi Generation 14 Ltd
400 MWScoping Harker 400kV Substation
National Grid (England & Wales)
Nov 2037
Maltby Dev.
Solar + storage · Firma Vogt Solar Ltd
400 MWScoping Thurcroft 275kV Substation
National Grid (England & Wales)
Oct 2034
Monk Fryston
Solar + storage · Enso Green Holdings X Limited
400 MWScoping Monk Fryston 400kV Substation
National Grid (England & Wales)
Oct 2031
Motherwell 400MW BESS (Formerly Castlehill BESS)
Battery storage · SPV GPC 3 Ltd
400 MWScoping Newarthill 275 kV Substation
SP Transmission (south Scotland)
Apr 2035
Netherton BESS
Battery storage · Harmony Energy Limited
400 MWScoping Longside 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Newchurch
Solar + storage · Littleton Pastures Solar Limited
400 MWScoping Newchurch 400kV Substation
National Grid (England & Wales)
Oct 2031
Norfolk Boreas
Offshore wind · Norfolk Boreas Limited
400 MWAwaiting Consents Necton 400kV Substation
National Grid (England & Wales)
Oct 2029
Norton
Solar + storage · Enso Green Holdings X Limited
400 MWScoping Norton East 400kV Substation
National Grid (England & Wales)
Oct 2032
Norwich Green Energy Centre
Solar + storage · Norwich NG Limited
400 MWAwaiting Consents Norwich Main 400kW Substation
National Grid (England & Wales)
Apr 2031
Oak Holt Solar
Solar + storage · RWE Renewables UK Solar and Storage Limited
400 MWScoping Trent Valley South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
Pelham 400
Solar + storage · Enso Green Holdings X Limited
400 MWScoping West Anglia Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2034
Rassau
Solar + storage · Enso Green Holdings Q Limited
400 MWScoping Rassau 400kV Substation
National Grid (England & Wales)
Oct 2030
Ryhall PV & BESS
Solar + storage · Kilnside Energy Park Limited
400 MWScoping West Anglia Connection Node G 400kV Substation
National Grid (England & Wales)
Oct 2034
Spennymoor BESS Station
Battery storage · Igp International Prospecting Limited
400 MWScoping Wearside Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2035
Springwell
Solar + storage · Springwell Energyfarm Limited
400 MWScoping Navenby 400kV Substation
National Grid (England & Wales)
Oct 2029
Staythorpe
Solar + storage · Enso Green Holdings X Limited
400 MWScoping Staythorpe 400kV Substation
National Grid (England & Wales)
Oct 2030
Stoke Bardolph 400
Solar + storage · Enso Green Holdings Limited
400 MWScoping Stoke Bardolph 400kV Substation
National Grid (England & Wales)
Oct 2034
Swansea
Solar + storage · Enso Green Holdings Limited
400 MWScoping Swansea North 400kV Substation
National Grid (England & Wales)
Oct 2032
Swansea North Green Energy Centre
Solar + storage · Swansea North Green Ng Limited
400 MWScoping Swansea North 400kV Substation
National Grid (England & Wales)
Oct 2028
Swansea North-Rhigos Solar& BESS & Wind
Solar + storage · Tyler Hill Consulting Limited
400 MWScoping South Wales West Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
TH Bridge Farm
Battery storage · FRV Powertek Limited
400 MWScoping Imperial Park B 400kV Substation
National Grid (England & Wales)
Oct 2037
TH Stocking Pelham
Battery storage · FRV Powertek Limited
400 MWScoping West Anglia Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2034
TH Stow Manor
Battery storage · FRV Powertek Limited
400 MWAwaiting Consents Trent Valley South Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2034
Thorpe Marsh Green Energy Centre
Solar + storage · Thorpe Marsh Ng Ltd
400 MWAwaiting Consents Thorpe Marsh 400kV Substation
National Grid (England & Wales)
Oct 2030
Page 11 of 32

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.