Home › Grid infrastructure › Connection queue
NESO TEC REGISTER · GREAT BRITAINGrid connection projects in the connection queue
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Glenside Farm BESS Battery storage · GPC 1211 Ltd |
400 MW | Scoping |
| Gresham House Gretna BESS Battery storage · Albusia Ltd |
400 MW | Scoping |
| Hams Hall Green Energy Centre Solar + storage · Hams Hall Ng Limited |
400 MW | Scoping |
| Harker Green Energy Centre Solar + storage · Blackdyke BESS Limited |
400 MW | Awaiting Consents |
| Heckington Fen Solar Park Solar + storage · Ecotricity (Heck Fen Solar) Limited |
400 MW | Scoping |
| HECWE Dungavel Wind Farm Solar + storage · Spirebush Ltd |
400 MW | Awaiting Consents |
| Heysham Green Energy Centre Solar + storage · Heysham Green Ng Limited |
400 MW | Awaiting Consents |
| High Marnham 400 Solar + storage · Enso Green Holdings X Limited |
400 MW | Awaiting Consents |
| High Marnham 400MW Field BESS Battery storage · Field High Marnham Ltd |
400 MW | Scoping |
| Hope Battery Storage Battery storage · Ibv Brinkburn Energy Park Limited |
400 MW | Scoping |
| Hurlet Battery Battery storage · P-Frequency Ltd |
400 MW | Scoping |
| Ironbridge Green Energy Centre Solar + storage · Ironbridge Green Ng Limited |
400 MW | Awaiting Consents |
| Kearsley North Green Energy Centre Solar + storage · Kearsley North Green NG Limited |
400 MW | Scoping |
| Keith BESS Station Battery storage · Ibv Coachford Energy Park Ltd |
400 MW | Scoping |
| Kelloe Mains Battery storage · Tbc 003 Limited |
400 MW | Scoping |
| Kingsnorth Power Station Solar + storage · Qe Kingsnorth Spv Limited |
400 MW | Scoping |
| Kirkby Green Energy Centre Solar + storage · Kirkby Green Ng Limited |
400 MW | Scoping |
| Lagrae Battery Storage Battery storage · Lagrae Battery Storage Limited |
400 MW | Scoping |
| Langage 400 Solar + storage · Enso Green Holdings X Limited |
400 MW | Scoping |
| Lawfield and Branxton Energy Park Battery storage · Cairn Duhie Energy Limited |
400 MW | Scoping |
| Legacy 400 Solar + storage · Enso Green Holdings Limited |
400 MW | Scoping |
| Legacy Green Energy Centre Battery storage · Legacy Green Energy Limited |
400 MW | Awaiting Consents |
| Lightsource Auchans Battery storage · Lightsource Renewable UK Development Limited |
400 MW | Scoping |
| Littlebrook GEC (Ethos Green) Solar + storage · Littlebrook Green Energy Centre Ltd |
400 MW | Awaiting Consents |
| Long Stratton 400 Solar + storage · Enso Green Holdings X Limited |
400 MW | Scoping |
| Long Stratton BESS Battery storage · Field Long Stratton Ltd |
400 MW | Scoping |
| Low Harker BESS Solar + storage · Energi Generation 14 Ltd |
400 MW | Scoping |
| Maltby Dev. Solar + storage · Firma Vogt Solar Ltd |
400 MW | Scoping |
| Monk Fryston Solar + storage · Enso Green Holdings X Limited |
400 MW | Scoping |
| Motherwell 400MW BESS (Formerly Castlehill BESS) Battery storage · SPV GPC 3 Ltd |
400 MW | Scoping |
| Netherton BESS Battery storage · Harmony Energy Limited |
400 MW | Scoping |
| Newchurch Solar + storage · Littleton Pastures Solar Limited |
400 MW | Scoping |
| Norfolk Boreas Offshore wind · Norfolk Boreas Limited |
400 MW | Awaiting Consents |
| Norton Solar + storage · Enso Green Holdings X Limited |
400 MW | Scoping |
| Norwich Green Energy Centre Solar + storage · Norwich NG Limited |
400 MW | Awaiting Consents |
| Oak Holt Solar Solar + storage · RWE Renewables UK Solar and Storage Limited |
400 MW | Scoping |
| Pelham 400 Solar + storage · Enso Green Holdings X Limited |
400 MW | Scoping |
| Rassau Solar + storage · Enso Green Holdings Q Limited |
400 MW | Scoping |
| Ryhall PV & BESS Solar + storage · Kilnside Energy Park Limited |
400 MW | Scoping |
| Spennymoor BESS Station Battery storage · Igp International Prospecting Limited |
400 MW | Scoping |
| Springwell Solar + storage · Springwell Energyfarm Limited |
400 MW | Scoping |
| Staythorpe Solar + storage · Enso Green Holdings X Limited |
400 MW | Scoping |
| Stoke Bardolph 400 Solar + storage · Enso Green Holdings Limited |
400 MW | Scoping |
| Swansea Solar + storage · Enso Green Holdings Limited |
400 MW | Scoping |
| Swansea North Green Energy Centre Solar + storage · Swansea North Green Ng Limited |
400 MW | Scoping |
| Swansea North-Rhigos Solar& BESS & Wind Solar + storage · Tyler Hill Consulting Limited |
400 MW | Scoping |
| TH Bridge Farm Battery storage · FRV Powertek Limited |
400 MW | Scoping |
| TH Stocking Pelham Battery storage · FRV Powertek Limited |
400 MW | Scoping |
| TH Stow Manor Battery storage · FRV Powertek Limited |
400 MW | Awaiting Consents |
| Thorpe Marsh Green Energy Centre Solar + storage · Thorpe Marsh Ng Ltd |
400 MW | Awaiting Consents |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.