Aggreko, Stirling Road - Solar Panels
Registered capacity
Scotland Β· Scotland
Aggreko
Adjust the page to suit you. Your choices are remembered.
Explore operating assets, construction and proposals across the electricity system. Find the capacity, planning status and evidence behind each project.
Use the map to explore the matching projects. Solid markers show published or mapped points; shaded dashed circles show approximate areas. Cable endpoints are shown separately.
Loading OpenStreetMapβ¦
Registered capacity
Scotland Β· Scotland
Aggreko
Registered capacity
Scotland Β· Scotland
Aldi Stores Limited
Registered capacity
Scotland Β· Scotland
REG Windpower Limited / ESB Energy Limited
Registered capacity
Scotland Β· Scotland
Scottish Southern Energy Renewables
Registered capacity
Scotland Β· Scotland
North Lanarkshire Council
Registered capacity
Scotland Β· Scotland
Custom Solar Limited
Registered capacity
Scotland Β· Scotland
Bells Food Group Limited
Registered capacity
Scotland Β· Scotland
Trio Power Limited
Registered capacity
Scotland Β· Scotland
Scottish Water
Registered capacity
Scotland Β· Scotland
Renewable Energy Systems (RES)
Registered capacity
Scotland Β· Scotland
Voltalia UK
Registered capacity
Scotland Β· Scotland
Bray Valve & Controls (UK)
Registered capacity
Scotland Β· Scotland
Scottish Water National Operations Control Centre
Registered capacity
Scotland Β· Scotland
Castleton Fruit Limited
Registered capacity
Scotland Β· Scotland
Shropshire Council
Registered capacity
Scotland Β· Scotland
Clyde Gateway Developments Limited
Registered capacity
Scotland Β· Scotland
BLC Energy
Registered capacity
Scotland Β· Scotland
Creative Regeneration
Registered capacity
Scotland Β· Scotland
The Greenspan Agency
Registered capacity
Scotland Β· Scotland
Forster Group Ltd
Registered capacity
Scotland Β· Scotland
BLC Energy
Registered capacity
Scotland Β· Scotland
Scottish Water
Registered capacity
Scotland Β· Scotland
Scottish Water
Registered capacity
Scotland Β· Scotland
3R Energy Solutions Limited
Proposed solar generation, up to
Perth & Kinross Β· Scotland
Aukera / Halfway Energy Park Ltd
Aukera proposes up to 500 MW of solar generation and up to 100 MW of co-located battery storage between Inchture, Errol and Rait. The project is at consultation and pre-application stage, not an operating farm. It supplements the July register with a later proposal.
Registered capacity
Scotland Β· Scotland
Harbro Limited
Registered capacity
Scotland Β· Scotland
Scottish Water Horizons
Registered capacity
Scotland Β· Scotland
Hillhouse Quarry Company Limited
Registered capacity
Scotland Β· Scotland
Home Smart Energy
Registered capacity
Scotland Β· Scotland
The James Hutton Institute
Registered capacity
Scotland Β· Scotland
Private Developer
Registered capacity
Scotland Β· Scotland
James Jones & Sons
Registered capacity
Scotland Β· Scotland
Kanthal Limited
Registered capacity
Scotland Β· Scotland
Mespil Solar Energy
Registered capacity
Scotland Β· Scotland
Renewco Power
Registered capacity
Scotland Β· Scotland
Wind2 / Octopus Energy
National figures from the Carbon Intensity API. These do not measure an individual projectβs output, cable flow or data-centre electricity use.
Explore conventional and nuclear power stations, grid connections, renewable technology guides and source updates.